Model QW-400 Vertical Wall Frame
f. The slotted mounting holes in the Bucky Bearing Brackets are pro-
vided to adjust tension on bearings (wheels). When adjusted prop-
erly, the wheels on all four brackets should rotate throughout the
entire travel distance of the Receptor Cabinet.
g. Slide Receptor Cabinet all the way down to bottom of Wall Frame.
h. Lift the counterweight so that the Pulley Cables slip over the Pul-
leys.
i.
Secure the Pulley Cables to two top Bucky Bearing Brackets on Re-
ceptor Cabinet using 1/4-20 x 1" hex head bolts and flat washers.
j.
Slowly allow the counterweight to pull Receptor Cabinet to top of
Wall Frame.
k. Check bumper stops making sure that the Receptor Cabinet does
not contact Wall Frame.
3. Install the Control Handle with bracket to right side Bucky Bearing
Bracket (for right-hand film loading) or left side Bucky Bearing Bracket
(for left-hand film loading).
Chapter 3 Assembly & Installation
13
Summary of Contents for QW-400 Series
Page 4: ...Model QW 400 Vertical Wall Frame THIS PAGE INTENTIONALLY LEFT BLANK ii Revision History ...
Page 6: ...Model QW 400 Vertical Wall Frame Table of Contents THIS PAGE INTENTIONALLY LEFT BLANK iv ...
Page 12: ...Model QW 400 Vertical Wall Frame THIS PAGE INTENTIONALLY LEFT BLANK Warranty Information x ...
Page 13: ...Chapter INTRODUCTION 1 1 ...
Page 14: ...2 ...
Page 16: ...Model QW 400 Vertical Wall Frame 4 Chapter 1 Introduction THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...5 Chapter SPECIFICATIONS 2 ...
Page 18: ...6 ...
Page 21: ...9 Chapter ASSEMBLY INSTALLATION 3 ...
Page 22: ...10 ...
Page 32: ...Chapter OPERATION 4 19 ...
Page 33: ...20 ...
Page 37: ...Model QW 400 Vertical Wall Frame 24 Chapter 4 Operation THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...Chapter MAINTENANCE 5 25 ...
Page 39: ...26 ...