Chapter 4: F2000 Customer Replaceable Units (CRUs)
PIB Canister Replacement
134
Quantum F2000 User’s Guide
b
Verify that no errors are reported.
Note:
Refer to
Check the Status of a Canister
Check the System Inventory of a Canister
Chapter 3, F2000 Basic Operations
for instructions on how
to check for errors.
PIB Canister Replacement
This section describes how to replace a degraded power interface board
(PIB) canister and includes the following sections:
•
•
PIB Canister Replacement Considerations
•
•
Note:
For a description of the power interface board (PIB) canister
component, see
on page 22 in
Chapter 2, F2000 Component Overviews
.
Required Tools
There are no tools required to replace this component.
PIB Canister
Replacement
Considerations
Before you begin a PIB canister replacement, review the following
information:
• PIB canisters are a hot-swappable component. You do not need to
stop all I/O from clients or remove power from the system to replace
a PIB canister.
• Take ESD precautions when replacing a PSU. For more information,