
Configuring and Operating the DLT2700 Mini-Library
DLT2000/DLT2500/DLT2700 Cartridge Tape Subsystem 5-15
5.7 Power-On Process
_________________________ Caution __________________________
Before applying power, verify the DLT2700 is set (see the
label on the mini-library rear panel) for the available ac
supply voltage.
___________________________________________________________
Table 5-3 explains what happens during each phase of the DLT2700 operation.
Table 5-3 Loader Power-On Self-Test
Phase
What Happens
1.
When you power on the DLT2700, the Loader Fault and Power On lights
on the loader OCP are on.
2.
One second later, all lights are on. Within 15 seconds, POST of the
loader mechanics completes.
•
=
If the Magazine Fault and Loader Fault lights turn off, loader POST
succeeded.
•
=
If the Magazine Fault and Loader Fault lights stay on, loader POST
failed.
3.
A few seconds later, the drive controller resets the loader.
4.
Loader POST starts again.
If
…
…
…
…
Then
POST
…
…
…
…
The Magazine Fault and Loader Fault lights
turn off and shortly after, all OCP lights but
Power On turn off
Passed
The Magazine Fault and Loader Fault lights
stay on
Failed
_________________________ Note _____________________________
If the Magazine Fault or Loader Fault lights remain on, POST
detected an error. See Chapter 6 for error conditions.
___________________________________________________________
5.
The elevator scans the magazine to determine which slots contain
cartridges.
Summary of Contents for DLT 2000
Page 18: ...Table of Contents xviii DLT2000 DLT2500 DLT2700 Cartridge Tape Subsystem...
Page 20: ...Revision History xx DLT2000 DLT2500 DLT2700 Cartridge Tape Subsystem...
Page 146: ...Firmware Update From Tape 7 18 DLT2000 DLT2500 DLT2700 Cartridge Tape Subsystem...
Page 291: ...DLT2000 SCSI Interface DLT2000 DLT2700 Cartridge Tape Subsystem 8 145...
Page 327: ...Sense Key Information C 6 DLT2000 DLT2500 DLT2700 Cartridge Tape Subsystem...
Page 345: ...Index 8 DLT2000 DLT2500 DLT2700 Cartridge Tape Subsystem...