ActiveScale™ OS X100 Rackless Installation Guide
194
8. Check
Resources
to confirm that the new system’s components are displayed with correct host
names.
For example, for a multi-site deployment, System Node 3 on the second system at site 1 should have
the host name
Site1-R02-SG03
.
Figure 13
-
90. Scale out: Confirmation on Resources pane
9. Contact support to update the SSH keys on the new system.
At this point, scaling out the system is done.
Tip:
If the existing system had encryption enabled, your new system(s)
automatically have encryption enabled also.
13.6.2 Post-requisites
On systems with virtual IPs defined, add virtual IPs to the System Nodes on the new system, and add these
nodes to the existing failover group. For details, see the
ActiveScale OS Administrator Guide
.
-
Summary of Contents for ActiveScale X100
Page 28: ...ActiveScale OS X100 Rackless Installation Guide 28...
Page 34: ...ActiveScale OS X100 Rackless Installation Guide 34...
Page 59: ...ActiveScale OS X100 Rackless Installation Guide 59 Figure 3 14 Installing the I O module...
Page 68: ...ActiveScale OS X100 Rackless Installation Guide 68...
Page 76: ...ActiveScale OS X100 Rackless Installation Guide 76...
Page 91: ...ActiveScale OS X100 Rackless Installation Guide 91 Figure 6 36 Cabling Storage Node 4...
Page 92: ...ActiveScale OS X100 Rackless Installation Guide 92 Figure 6 37 Cabling Storage Node 5...
Page 94: ...ActiveScale OS X100 Rackless Installation Guide 94 Figure 6 39 Cabling System Node 1...
Page 95: ...ActiveScale OS X100 Rackless Installation Guide 95 Figure 6 40 Cabling System Node 2...
Page 98: ...ActiveScale OS X100 Rackless Installation Guide 98...
Page 108: ...ActiveScale OS X100 Rackless Installation Guide 108...
Page 110: ...ActiveScale OS X100 Rackless Installation Guide 110...
Page 127: ...ActiveScale OS X100 Rackless Installation Guide 127 Figure 10 19 Post Login Storage Policy...
Page 155: ...ActiveScale OS X100 Rackless Installation Guide 155 Figure 10 47 Post Login Durability Policy...
Page 162: ...ActiveScale OS X100 Rackless Installation Guide 162...
Page 234: ...ActiveScale OS X100 Rackless Installation Guide 234...
Page 238: ...ActiveScale OS X100 Rackless Installation Guide 238...
Page 240: ...ActiveScale OS X100 Rackless Installation Guide 240...
Page 244: ...ActiveScale OS X100 Rackless Installation Guide 244...
Page 260: ...ActiveScale OS X100 Rackless Installation Guide 260...
Page 264: ...ActiveScale OS X100 Rackless Installation Guide 264...