ix
ACL 4/52 Facilities Planning and Installation Guide
0
Figures
Figure 1
Library Mechanical Specifications ..........................................2
Figure 2
Library Power Specifications ...................................................2
Figure 3
Library Environmental Specifications ....................................2
Figure 4
Floor Space Requirements ........................................................3
Figure 5
Library’s AC Power Receptacle ..............................................4
Figure 6
Space Requirements for Unloading ........................................6
Figure 7
Removing the Box from the Pallet...........................................7
Figure 8
Unpacking the Library..............................................................8
Figure 9
Rolling the Library Off the Pallet ............................................9
Figure 10 Removing the Left Panel.........................................................12
Figure 11 Removing Tie-Wraps ..............................................................13
Figure 12 Removing the Foam Blocks ....................................................14
Figure 13 Tape Cartridge Orentation .....................................................14
Figure 14 Cabling the Library..................................................................27
Figure 15 Single Wire SCSI Configuration (Default) ...........................30