Data Protection
5-13
Step 3
Insert the data cartridge into the slot.
Step 4
Push the cartridge into the drive.
Step 5
Push the
Cartridge Insert/Release Handle
closed.
The drive will go on-line.
A load sequence will initiate where the
Operate Handle
LED will turn OFF and the
Tape in Use
LED will blink
while the drive moves the tape to BOT (Beginning of Tape).
When the tape is at BOT, the
Tape in Use
LED will turn ON
steady. Additionally, one of the compression density LEDs
on the Left Indicator Panel may be illuminated or blinking.
The tape is now ready for use.
Data Protection
The
Write-Protect
switch on the data cartridge can be
moved while the cartridge is loaded into the drive. The drive
will turn on the
Write-Protect
LED immediately. However,
if the drive is writing to the tape, write protect does not take
effect until the write operation completes.
Before loading the data cartridge, if you move the
Write-Protect
switch to the left, the tape is write-protected;
the
Write Protected
LED (orange) is ON and data cannot be
written to, or erased from, the tape.
Before loading the data cartridge, if you move the
Write-Protect
switch to the right, the tape is write-enabled
and data can be written to, or erased from, the tape (if it is not
software write-protected).
After loading the data cartridge and during operation, if you
move the
Write-Protect
switch from the write-protected
position (to the left) to the write-enabled position (to the
right), the tape becomes write-enabled after a variable amount
of time (seconds).
After loading the data cartridge and during operation, if you
move the
Write-Protect
switch from the write-enabled
position (to the right) to the write-protected position (to the
left), the tape becomes write-protected after a variable amount
of time (seconds).
Tape in Use
Whenever the
Tape in Use
LED (yellow) is ON steady, the
tape is ready to use. When the tape is being read, written, or
rewound,
Tape in Use
blinks.
Caution
Summary of Contents for 4000 Enhanced
Page 1: ...The 4000 7000DLT Tabletop Series Installation and Operation Guide...
Page 8: ...viii Figures 62 0162 01...
Page 10: ...x Tables 62 0162 01...
Page 12: ...1 2 Introduction 62 0162 01...
Page 16: ...2 2 Description 62 0162 01...
Page 19: ...Description 2 5 Figure 2 1 7000DLT Front Panel...
Page 20: ...2 6 Description 62 0162 01 Figure 2 2 4000DLT Front Panel...
Page 26: ...2 12 Description 62 0162 01...
Page 27: ...3 Safety Safety Conventions 3 3 Precautions 3 4...
Page 28: ...3 2 Safety 62 0162 01...
Page 32: ...3 6 Safety 62 0162 01...
Page 34: ...4 2 Installation 62 0162 01...
Page 40: ...4 8 Installation 62 0162 01...
Page 42: ...5 2 Operation and Maintenance 62 0162 01...
Page 60: ...6 2 Troubleshooting and Diagnostic 62 0162 01...
Page 66: ...6 8 Troubleshooting and Diagnostic 62 0162 01...
Page 67: ...A Specification General Specification A 3...
Page 68: ...A 2 Specification 62 0162 01...
Page 72: ...B 2 Drive Configuration 62 0162 01...
Page 78: ...B 8 Drive Configuration 62 0162 01...
Page 80: ...C 2 Regulatory Notices 62 0162 01...
Page 88: ...in 10 Index 62 0162 01...