Installing the Library
XLS Library Site Planning Guide
3-31
An uninterruptible power source (UPS) is strongly recommended. Be sure the UPS is
rated to handle the peak power loads listed in
Table 3-13 on page 3-20
.
CAUTION
If equipment will be installed in the optional auxiliary equipment rack,
it must be connected to a separate power circuit.
3.4
Cooling Requirements
The XLS draws fresh cooling air through the grille and air filters on the front of the
library and exhausts warm air out the back. The BTUs/hour figures in
Table 3-13 on
page 3-20
, above, indicate the air conditioning capacity needed to remove the heat
generated by example XLS systems.