QualGear QG-PM-002-WHT-S Installation Manual Download Page 3

Cable Management

1

Mounting to a Wooden Ceiling 

2a

3

4

OR

Using an edge-to-edge stud finder, find the
edges of the stud. 

Using a straight edge, mark the centerline 
of the stud. 

Using a power drill and 3/16" drill bit, 
drill pilot holes of 3/16" (4.5 mm) diameter
and at least 2.5" (65 mm) depth.  

Using the marking template provided,
mark two holes for drilling on the centerline
of the stud.  

Feed the projector cable(s) through the side of the Ceiling Plate.

For concrete ceiling mounting, 
follow Step 2b.

NOTE

ø 4.5mm

  

1

2

3

4

Feed the projector cable(s) through the top of the Ceiling Plate.

(2.5")

(ø 3/16")  

Depending on the direction of the studs, 

choose the mounting holes accordingly.

centerline of the stud

centerline of the stud

TIP

Ceiling Plate with Connector

65mm

(2.5")

65mm

Reviews: