7

See B5 below for recommended maximum lead length (two 

wire) when using wall thermostat/switch.

This  appliance 

DOES NOT

  require  110  VAC  supply  for 

operation. A wiring diagram is shown in 

on the 

next page.

This appliance is equipped with a millivolt control valve.

NOTE:

    This  appliance  must  be  electrically  wired  and 

grounded in accordance with local codes or, in the absence 

of  local  codes,  with 

National Electric Code ANSI/NFPA 

70-latest edition

  or  the 

1.  This  appliance  may  be  used  with  a  wall  switch,  wall 

mounted thermostat and / or a remote control.

2.  If using thermostat, use one compatible with a millivolt 

gas valve system.

3.  Follow parameters for locating thermostat (see individ-

ual thermostat instructions) to ensure proper operation 

of appliance.

4.  Use low resistance thermostat wire for wiring from igni-

tion system to the wall switch and thermostat.

5.  Use the following chart for wire sizing.

6.  Keep  wire  lengths  as  short  as  possible  by  removing 

any excess wire length.

7.  Low  voltage  and  110  VAC  voltage  cannot  be  shared 

within the same wall box.

16 gauge

65 feet

18 gauge

40 feet

20 gauge

25 feet

22 gauge

18 feet

Shock hazard.

• This appliance is equipped with a three 

pronged (grounding) plug for your protection 

against shock hazard and should be plugged 

directly into a properly grounded three prong 

receptacle. Do not cut or remove the grounding 

prong from this plug.

Wire 110v to electrical junction box. 

Do NOT wire 110v to the valve.

Do NOT wire 110V to wall switch.

•  Incorrect wiring will damage millivolt 

systems.

8.  Ensure  the  thermostat  is  mounted  level  for  accurate 

readings.

9.  The thermostat should be mounted on an inside wall 

and not in direct line with the appliance convection air.

10.  If the thermostat is located too close to the appliance, 

you  may  need  to  set  the  temperature  setting  slightly 

higher  to  maintain  the  desired  temperature  in  your 

home.

•  A 110-120 VAC circuit for this product must be protected 

with  ground-fault  circuit-interrupter  protection,  in 

compliance with the applicable electrical codes, when 

it is installed in locations such as in bathrooms or near 

sinks.

Summary of Contents for COLBAY-FS-B

Page 1: ...anufactured home USA only or mobile home and must be installed in accordance with the manufacturer s instructions and the manufactured home construction and safety standard Title 24 CFR Part 3280 or S...

Page 2: ...mum 65 42 NG 65 96 LP APPROUV POUR LE CANADA ET LES TATS UNIS ANSI Z21 88a 2001 CSA 2 33a M01 Fournaises au Gaz avec Ventilation et les sections applicable de UL 307b Appareils de Chauffage Au Gaz pou...

Page 3: ...rmination 12 G Vertical Termination 15 A Fuel Conversions 22 B Gas Pressures 24 C Gas Connection 24 A Recommendation for Wire 26 B Connecting to the Appliance 26 C Standing Pilot Ignition System Wirin...

Page 4: ...put BTU Minimum Input BTU Ori ce Size DMS Ef ciency Up To P 4 30 000 21 000 36 84 73 3 30 000 24 500 52 86 75 1 Manufactured Home or Mobile Home installation may occur only after the home is site loca...

Page 5: ...uilding at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in pri...

Page 6: ...glass door and set aside on pro tective surface Remove log set and component pack from rebox Report to your dealer any parts damaged in shipment particularly the condition of the glass fi Keep applian...

Page 7: ...speci cations in manual Model A A B C D E F G H I Columbia Bay FS Inches 6 6 3 4 2 6 14 2 84 19 36 36 Millimeters 152 171 515 152 356 51 2134 483 914 914 NOTE Flooring beneath appliance may reach 90 d...

Page 8: ...o 9 12 2 0 Over 9 12 to 10 12 2 5 Over 10 12 to 11 12 3 25 Over 11 12 to 12 12 4 0 Over 12 12 to 14 12 5 0 Over 14 12 to 16 12 6 0 Over 16 12 to 18 12 7 0 Over 18 12 to 20 12 7 5 Over 20 12 to 21 12 8...

Page 9: ..._____________________________________ _ _ QMIN RMAX 1 cap 3 feet 2 x Q ACTUAL 2 caps 6 feet 1 x Q ACTUAL 3 caps 9 feet 2 3 x Q ACTUAL 4 caps 12 feet 1 2 x Q ACTUAL QMIN termination caps x 3 RMA X 2 te...

Page 10: ...nnected to the ue Diagonal runs have both vertical and horizontal vent aspects when calculating the effects Use the rise for the vertical aspect and the run for the horizontal aspect See Two 45 elbows...

Page 11: ...If the vertical dimension from the center line of the ue vent to the center of the 90 elbow is 7 ft 2m the horizontal run to the outer wall ange must not exceed 13 ft 4m EXAMPLE 2 If the vertical dim...

Page 12: ...t vent sections per installation instructions Maintain all clearances to combustibles Do NOT allow vent to sag below connection point to appliance Maintain speci ed slope if required Improper support...

Page 13: ...of non hardening mastic around its outside edges so as to make a seal between it and the wall attach termination cap to the exterior wall with the four wood screws provided The arrow on the vent cap s...

Page 14: ...st be sealed with silicone with a minimum of 300 F continuous exposure rating Termination caps shall not be recessed into a wall or siding Fire Risk Explosion Risk Maintain vent clearance to combustib...

Page 15: ...on vertical runs is 1 ft 305mm ADDITIONAL RESTRICTION This installation may not have two horizontal sections connected by 90 elbows Check the installation instructions for required 1 in 25mm clearanc...

Page 16: ...sure that all pipe and elbow connections are in their fully twist locked position Assemble as instructed NOTE 1 If an offset is necessary in the attic to avoid obstructions it is important to support...

Page 17: ...ng sealant above and below the joint between the storm collar and the pipe OPTIONAL HIGH WIND TERMINATION CAP SECURE FLASHING WITH NON HARDENING SEALANT AND ROOFING NAILS CLEARANCE CEILING FIRESTOP NA...

Page 18: ...pport box to make a seal between it and the roof Clean out any combustible material from inside the support box Complete the cathedral ceiling installation by following the same procedures outlined in...

Page 19: ...p Ensure that you are drilling into the metal on the chimney Twist lock the high wind termination cap onto the top adapter Pull the flex pipe down through the ceiling support box until it protrudes ap...

Page 20: ...retro connector to mount directly on the masonry and provide the correct clearances to combustibles Secure the flashing to the top of the masonry chimney using a bead of non hardening sealant adhesiv...

Page 21: ...needed Be careful to ensure that the connector is centered in the opening and the mounting holes line up with the masonry wall Secure the top adapter to the flashing Use three sheet metal screws throu...

Page 22: ...th care With a 5 8 in wrench remove ori ce retaining nut Replace with appropriate ori ce KIT CONTENTS fi TOOLS REQUIRED Power drill a 90 handle is helpful 2 Phillips bit 5 32 in Allen wrench 5 8 in op...

Page 23: ...e explosion or production of carbon monoxide may result causing property damage personal injury or loss of life The quali ed service agency is responsible for the proper installation of this conversio...

Page 24: ...g NOTE A listed and Commonwealth of Massachusetts approved 1 2 inch 13mm T handle manual shut off valve and exible gas connector are connected to the 1 2 inch 13mm control valve inlet NOTE The gap bet...

Page 25: ...s Do not use open ame After the gas line installation is complete all connections must be tightened and checked for leaks with a commercially available non corrosive leak check solution Be sure to rin...

Page 26: ...short as possible by removing any excess wire length 7 Low voltage and 110 VAC voltage cannot be shared within the same wall box 16 gauge 65 feet 18 gauge 40 feet 20 gauge 25 feet 22 gauge 18 feet Sh...

Page 27: ...trols Wiring errors can cause improper and dangerous operation Verify proper operation after servicing Shock hazard Replace damaged wire with type 105O C rated wire Wire must have high temperature ins...

Page 28: ...accessories may be used safely IMPORTANT PREVENT PERMANENT STAINING 2 Screws 2 Screws Use a soft cloth and a window cleaning solution to clean all fingerprint oils from the gold or nickel surface of...

Page 29: ...sed with the brick set Install the left and right brick panels Use the screw placement shown in to secure them in place Reassemble appliance While still breakable the logs do not become fragile until...

Page 30: ...he existing door from the appliance Remove the crown from the existing door by removing four screws on the back side of the door assembly Pull crown off door face Install replacement door with glass o...

Page 31: ...eded retaining all fasteners and remove the blower Reassemble blower in housing using fasteners previously removed Reinstall blower housing to appliance Turn power supply back on TOOLS REQUIRED Philli...

Page 32: ...uch as to cause a sooty flame Improper adjustment can cause sooting in the firebox and or on the outside of a house with a horizontal termination After adjustment tighten nut to lock in place The vert...

Page 33: ...baf e adjustment Ensure that there are no gas leaks Ensure that the glass is sealed and in the proper posi tion Ensure that the ow of combustion and ventilation air is not obstructed front grilles and...

Page 34: ...ppliance May need to remove face front first 5 Push in gas control knob slightly and turn clockwise to the OFF position Do not force 6 Wait five 5 minutes to clear out any gas Smell for gas including...

Page 35: ...ting to sensitive individuals CAUTION Prevent accidental appliance operation when not attended Unplug or remove batteries from remote control if absent or if appliance will not be used for an extended...

Page 36: ...the gas valve is fully inserted and tight hand tighten plus 1 4 turn Disconnect the thermocouple from the valve place one millivolt lead wire on the tip of the thermocouple and the other meter wire o...

Page 37: ...into the system Check for proper vent connection at ue collar and all vent joints c Horizontal vent improperly pitched The horizontal vent cap should slope down only enough to prevent any water from e...

Page 38: ...ers Use a hard water deposit glass cleaner on white lm Do NOT clean glass when hot Turn off appliance after 3 4 hours of operation and ALLOW TO COOL Remove and clean glass assembly Replace glass assem...

Page 39: ...rforation Sand and repaint as neces sary 2 Replace appliance if rebox has been perforated Burner Ignition and Operation 1 Verify burner is properly secured and aligned with pilot or igniter 2 Clean of...

Page 40: ...Page 40 Quadra Fire COLBAY FS B 250 5195 Rev R 10 11...

Page 41: ...2 Dimensions are actual appliance dimensions Use for reference only For clearances refer to Section 3 A B F G H I J K C D E A 22 1 2 572 G 11 1 4 286 B 28 1 2 724 H 7 3 4 197 C 16 406 I 5 127 D 18 3 4...

Page 42: ...n 133 mm 25 1 4 in 641 mm 37 1 4 in 946 mm 49 1 4 in 1251 mm 13 1 4 in 337 mm 13 1 4 in 337 mm 6 5 8 in 168 mm 6 5 8 in 168 mm 6 5 8 in 168 mm 6 5 8 in 168 mm SLP45 SLP90 SLP12 SLP6 SLP4 SLP24 SLP36 S...

Page 43: ...op SLP WS Wall Firestop SLP HVS Pipe Support Hanger 950 Vinyl Protector Kit SL Pipe DRC RADIUS Decorative Radius Cover HTI DV WT Wall Thimble RF4 8 Roof Flashing TERMINATION KITS SLP TRAP2 Trapezoid T...

Page 44: ...n the case of new home construction warranty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distribu...

Page 45: ...V D KHDWLQJ DSSOLDQFH VRPH FKDQJHV LQ FRORU RI LQWHULRU DQG H WHULRU VXUIDFH ILQLVKHV PD RFFXU 7KLV LV QRW D IODZ DQG LV QRW FRYHUHG XQGHU ZDUUDQW DPDJH WR SULQWHG SODWHG RU HQDPHOHG VXUIDFHV FDXVHG E...

Page 46: ...ce Do NOT discard this manual CAUTION Important operating and maintenance instructions included Read understand and follow these instruc tions for safe installation and operation Leave this manual wit...

Reviews: