6
7022-514C
July 7, 2015
CASTILE INSERT
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual.
Customer:
Date Installed:
Lot/Address:
Location of Fireplace:
Installer
:
Dealer/ Distributor Phone #:
Serial #:
Model (circle one):
CASTILEI-MBK
CASTILEI-PMH
CASTILEI-CSB
CASTILEI-CWL
WARNING! Risk of Fire or Explosion! Failure to install fi replace according to these instructions can lead to a fi re or explosion.
Appliance Install
Verifi ed clearances to combustibles. (Pg. 8)
Fireplace is leveled and liner is secured to appliance. (Pg. 19)
Hearth extension size/height decided. (Pg. 9)
Outside air kit installed. (Pg. 19)
Floor protection requirements have been met.
The masonry chimney is inspected by a professional and is clean or the
factory built metal chimney is installed according to the manufacturer’s
instructions and clearances.
Chimney Section 4 (Pg. 12)
Chimney confi guration complies with diagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney meets the minimum height requirements.
Roof fl ashing installed and sealed.
Terminations installed and sealed.
Clearances Section 3 (Pg. 7)
Combustible materials not installed in non-combustible areas.
Verifi ed all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Protective hearth strips and hearth extension installed per manual requirements.
Appliance Setup Section 6 (Pg. 19)
All packaging and protective materials removed.
Firebrick, baffl e and ceramic blanket installed correctly.
All labels have been removed from the door.
All packaging materials are removed from inside/under the fi replace.
Manual bag and all of its contents are removed from inside/under the fi replace
and given to the party responsible for use and operation.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your fi le.
• That this checklist remain visible at all times on the fi replace until the installation is complete.
Comments:
Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:
Comments communicated to party responsible by on
(Builder/Gen. Contractor) (Installer) (Date)
Part # 4017-254 • Rev B • 01/29/13
YES IF NO, WHY?
E. Install Checklist