Quadra-Fire 57ST-ACC-AU Installation Instructions Manual Download Page 12

Page  12

7038-201

July 19, 2012

Date purchased/installed: 

 

Serial Number:  

  Location on appliance:  

Dealership purchased from:  

  Dealer phone:  

Notes:  

  

 

  

 

  

We recommend that you record the following pertinent

 information for your 5700 Step Top ACC STOVE

DO NOT DISCARD THIS MANUAL

CAUTION

•  Important operating and 

maintenance instruc-

tions included.

• 

Leave this manual with 

party responsible for use 

and operation.

• 

Read, understand and 

follow these instruc-

tions for safe installa-

tion and operation.

DO NOT

DISCARD

Please contact your Quadra-Fire dealer with any questions or concerns. 

For the number of your nearest Quadra-Fire dealer

logo onto 

www.quadrafire.com

 

CONTACT INFORMATION

:

Summary of Contents for 57ST-ACC-AU

Page 1: ...stallations with tested flue systems as per AS NZS 2918 2001 Appendix F with a ceiling angle between 0 30 inclusive For installations with a ceiling angle greater than 30 refer to Fig 6 7 and AS NZS 2...

Page 2: ...yment in the warmth and comfort of your hearth appliance Thank you for choosing Quadra Fire 5700 STEP TOP ACC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2012 2013 2014 INSTALLATION DATE MILLENNIU...

Page 3: ...700 STEP TOP ACC Wood Burner Dimensions Pedestal Model Quadra Fire 5700 STEP TOP ACC Wood Burner Dimensions Leg Model 33 mm 245 mm 662 mm 945 mm 89 mm 94 mm 699 mm 94 mm 686 mm 535 mm 280 mm 435 mm 37...

Page 4: ...are tested and comply with the minimum Floor Protector requirements of AS NZS 2918 2001 Note The minimum Floor Protector sizes are specified in the clearance chart see Table 1 2 A Floor Protector can...

Page 5: ...projection from wall 841 E Min overall floor protector depth 1615 F Min floor protector front width 850 CORNER POSITIONING 45 Drawing not to scale Table 2 Fig 4 FIREBOX INSTALLATION 1 If a separate f...

Page 6: ...ceptable Solution from 01 07 05 5 Install the outer casing so that i lower end is flush with the underside of the ceiling material and ii with the addition of metal L brackets affix to the outer casin...

Page 7: ...ombustible material Non combustible material Hebel block or 12mm Promina board or similar under the flashing 25 25 Approved Flashing Roof Line Inner Casing 200mm above roof line Outer Casing Inner Cas...

Page 8: ...g 4 6 downward distance of casing and 3 x flue distance of the ceiling plate ADD Cowl Casing Cover Spider Bracket Approved Flashing A Ceiling Plate Batten A 3 x flue pipe Ceiling flue pipe Fig 7 ADD C...

Page 9: ...g the entral tongue to locate inside the flue outlet only Two tabs are provided and if folded back at 90 degrees the bracket and Flue Mounted Shield will mount lower onto the appliance The Flue Mounte...

Page 10: ...TION IS CONSIDERED THE MAN UFACTURER SHOULD BE CONSULTED IN THE FIRST INSTANCE CAUTIONS CRACKED AND BROKEN COMPONENTS e g GLASS PANELS OR CERAMIC TILES MAY RENDER THE INSTALLATION UNSAFE WARNING ANY M...

Page 11: ...July 19 2012 7038 201 Page 11 R 5700 Step Top ACC Wood Burner Service And Maintenance Log Date of Service Performed By Description of Service...

Page 12: ...TOVE DO NOT DISCARD THIS MANUAL CAUTION Important operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow these instr...

Reviews: