QSW-6300 Series Switches Hardware Installation and Reference Guide
Verifying Operating Status
36
Figure 4-4
5. After setting the serial port parameters, click
OK
. The Hyperterminal window appears.
4.2. Checking Environment before/after Power-on
4.2.1. Checking Environment before Power-on
Check whether the switch is properly grounded.
Check whether the power cord is properly connected.
Check whether the power supply voltage meets the requirement.
Check whether the network cable is properly connected, whether the terminal (may be
PC) is started, and whether configuration parameters are configured.
4.2.2. Checking Environment after Power-on (Recommended)
After power-on, check the following items:
Check the information appears on the terminal interface.
Check the switch indicator status.