background image

6

Wire the Loudspeakers

1.  Back out the conduit cover's Phillips retaining screw to its stop point and pull the conduit cover straight out to remove as shown in step 1 of Figure 4.

2.  Pass the CAT cable through the conduit/stress-relief clamp, leaving enough wire for making connections as shown in step 2 of Figure 4. Carefully tighten the clamp over the wires, or over the 

conduit if used.

3.  Plug the RJ45 connector securely into the jack as shown in step 3 of Figure 4.

4.  Reattach the conduit cover and secure with the Phillips retaining screw as shown in step 4 of Figure 4.

1

2

3

4

— Figure 4 —

RJ45 CONNECTOR

RETAINING SCREW

CONDUIT COVER

RETAINING SCREW

CONDUIT COVER

CONDUIT COVER

CONDUIT CLAMP

CONDUIT

CONDUIT COVER

CAT CABLE

Summary of Contents for Q-SYS NL-C4

Page 1: ...Hardware User Manual NL C4 4 Full range Low profile Ceiling mount Network Loudspeaker TD 001637 01 A TD 001637 01...

Page 2: ...stions arise regarding a physical equipment installation Maintenance and Repair WARNING Advanced technology e g the use of modern materials and powerful electronics requires specially adapted maintena...

Page 3: ...O O O O O Chassis Assemblies X O O O O O SJ T 11364 O GB T 26572 X GB T 26572 This table is prepared following the requirement of SJ T 1 1364 O Indicates that the concentration of the substance in all...

Page 4: ...abit Ethernet and Power over Ethernet PoE Cat5e cabling or better required PoE Type 2 Class 4 capable ID Button Press to identify this product in Q SYS Designer Software and Q SYS Configurator The STA...

Page 5: ...tall two telescoping tile rails 2 one on each side of the hole and supported by the suspended ceiling support rails 3 3 Install the C ring 4 over the hole using the tile rails as support Make sure the...

Page 6: ...or making connections as shown in step 2 of Figure 4 Carefully tighten the clamp over the wires or over the conduit if used 3 Plug the RJ45 connector securely into the jack as shown in step 3 of Figur...

Page 7: ...ten the screws the dog ears will swing into capture position over the c eiling Be sure all dog ears are properly positioned over the ceiling 5 Tighten the dog ears until firm contact is made with the...

Page 8: ...r network status Left LED Right LED Yellow Green Dark Disconnected Dark Disconnected 10Mbps 100Mbps Solid Link Solid 1 Gigabit Link Flashing Activity 2 For Q SYS status check the status LED under the...

Page 9: ...Support and Customer Care including their phone numbers and hours of operation https www qsc com contact us Warranty For a copy of the QSC Limited Warranty visit the QSC LLC website at www qsc com 202...

Reviews: