![background image](http://html2.mh-extra.com/html/qsan-technology/xcubedas-xd5324d/xcubedas-xd5324d_owners-manual_3295294043.webp)
Installing the System Hardware
29
Figure 3-11
Third Step of the Slide Rails Installation
4.
Fourth step of the slide rails installation
。
Pull the middle member fully extended in locked position.
。
Ensure ball bearing retainer is located at the front of the middle member.
。
Insert chassis into middle-outer member.
。
When hitting the stop, pull/push release tab to unlock and retract chassis into rack.
。
Use M5x20 screws to fasten the chassis ear.
8
INFORMATION:
8
If you purchase optional slide rails, M5x20 screws that are dedicated for
optional slide rails are packed in the screws pack.
Summary of Contents for XCubeDAS XD5324D
Page 83: ...Support and Other Resources 69...