
2–Planning
Security
2-28
59265-02 B
5.
Create a security set (Security_Set_2) on Switch_2. Create an ISL group
(Group_ISL_2) in Security_Set_2 with Switch_1 and Switch_2 as members,
as shown in the following:
6.
Save and activate Security_Set_2 on Switch_2.
Switch_2
Node WWN: 10:00:00:c0:dd:07:e3:4e
Authentication: CHAP
Primary Hash: MD5
Primary Secret: abcdefabcdef0123
Binding: None
Switch_1
Node WWN: 10:00:00:c0:dd:07:e3:4c
Authentication: CHAP
Primary Hash: MD5
Primary Secret: 0123456789abcdef
Binding: None
Summary of Contents for SANbox 5800V Series
Page 1: ...59265 02 B Installation Guide Stackable Fibre Channel Switch 5800V Series Firmware Version 8 0...
Page 26: ...Preface Technical Support xxvi 59265 02 B...
Page 70: ...2 Planning Fabric Management 2 32 59265 02 B...
Page 90: ...3 Installation Installing Feature License Keys 3 20 59265 02 B...
Page 110: ...5 Removal Replacement Power Supply Removal and Replacement 5 4 59265 02 B...
Page 126: ...Installation Guide Stackable Fibre Channel Switch 5800V Series Glossary 8 59265 02 B...
Page 133: ......