IB6054601-00 F
Preliminary
Using LEDs to Check the State of the
Adapter-1
D
Troubleshooting
This appendix describes some of the tools you can use to diagnose and fix
problems. The following topics are discussed:
Using LEDs to Check the State of the Adapter
Kernel and Initialization Issues
OpenFabrics and InfiniPath Issues
System Administration Troubleshooting
Troubleshooting information for hardware installation is found in the
QLogic
InfiniBand
®
Adapter Hardware Installation Guide and software installation is found
in the
QLogic InfiniBand
®
Fabric Software Installation Guide.
Using LEDs to Check the State of the Adapter
The LEDs function as link and data indicators once the InfiniPath software has
been installed, the driver has been loaded, and the fabric is being actively
managed by a subnet manager.
describes the LED states. The green LED indicates the physical link
signal; the amber LED indicates the link. The green LED normally illuminates first.
The normal state is
Green On
,
Amber On
. The QLE7240 and QLE7280 have an
additional state, as shown in
Table D-1. LED Link and Data Indicators
LED States
Indication
Green OFF
Amber OFF
The switch is not powered up. The software is neither
installed nor started. Loss of signal.
Verify that the software is installed and configured with
ipath_control -i
. If correct, check both cable con-
nectors.
Summary of Contents for OFED+ Host
Page 1: ...IB0054606 02 A OFED Host Software Release 1 5 4 User Guide...
Page 14: ...xiv IB0054606 02 A OFED Host Software Release 1 5 4 User Guide...
Page 22: ...1 Introduction Interoperability 1 4 IB0054606 02 A...
Page 96: ...4 Running MPI on QLogic Adapters Debugging MPI Programs 4 24 IB0054606 02 A...
Page 140: ...6 SHMEM Description and Configuration SHMEM Benchmark Programs 6 32 IB0054606 02 A...
Page 148: ...8 Dispersive Routing 8 4 IB0054606 02 A...
Page 164: ...9 gPXE HTTP Boot Setup 9 16 IB0054606 02 A...
Page 176: ...A Benchmark Programs Benchmark 3 Messaging Rate Microbenchmarks A 12 IB0054606 02 A...
Page 202: ...B SRP Configuration OFED SRP Configuration B 26 IB0054606 02 A Notes...
Page 206: ...C Integration with a Batch Queuing System Clean up PSM Shared Memory Files C 4 IB0054606 02 A...
Page 238: ...E ULP Troubleshooting Troubleshooting SRP Issues E 20 IB0054606 02 A...
Page 242: ...F Write Combining Verify Write Combining is Working F 4 IB0054606 02 A Notes...
Page 280: ...G Commands and Files Summary of Configuration Files G 38 IB0054606 02 A...
Page 283: ......