Installation
32
UM-PRORUNNER_mk9-2.0-EN
15. Attach the flat belts to the carrier with
clamping plates (N).
16. Install the cable carrier (P) with strip (O).
Refer to the machine layout drawing for
the correct position.
17. Connect the cable carrier to end piece
(Q).
18. Connect the electrical parts in accordance
with the electrical diagrams. Use the cable
tray in the column to guide the cables to
the drive section.
Refer to chapter
for more information about
the electrical set-up.
5.7
Installing the moveable conveyor
N
O
P
Q
Note
If a moveable conveyor is included in the delivery, it is pre-installed on the
carrier.