10
11
Step 3
With the C/D FastMount® Hinge Rail resting on the floor
in the desired location, use the provided Installation
Level to make sure it is vertical. Remove the protective
liner from the adhesive tape on the level so that the level
can be attached to the rail. Use the Marking Tool to mark
the 2 screw locations.
Step 4
Remove the screws that hold the top cover on the Top
Lock and remove the top cover, as well as the Main Lock
for access to the upper screw hole. Repeat Step 3 for the
Locking Rail.
Step 5
Attach the FastMount® Rails using the appropriate screws
per above.
Step 6
If the gate is mounted at any angle
within 180 degrees, make sure to
reinstall the Main Lock, so it points
directly toward the Hinge rail.
Install the Top Cover and insert the
screws to hold it in place.
Step 7
Based on your opening size, determine the width your
gate needs to be in the sizing chart on page 4. To adjust
the size of the gate, remove the 4 clamps using the Allen
Wrenches. Reposition the gate panels to the desired
width.
Replace the clamps in the outer positions where the
panels overlap and tighten with the Allen Wrenches.
Make sure the clamps line up in the grooves on the
panels.
Main Lock
Top Cover