background image

FlaggerJoe Assembly Instructions 

 

Item:   FJ-SSUMB10 - Safety Sign System 

A = Umbrella Canopy 
B = Lower Umbrella Pole 
C = Double Flag Finial 
D = Flags (2) 
E = Sign Mount 
F = 34” Black PVC Post 
G = Extra Top Pole for Wind 
H = Carry / Storage Bag 
J = 24” Black PVC Post 
K = Rolling Base 

Step 1  

Slide 24” black pvc post (J) into center post of rolling base (K). Line up hole in “J” 
with threaded knob. See figure 1 
 

Step 2 

Slide lower umbrella pole (B) into 24” black PVC post (J).  Hand tighten threaded 
knob pictured in Figure 1. 
 
 
 
 
 
 
 
 

 

 
Step 3 

Open umbrella canopy (A) 

– Slide pin into the highest position so the canopy is  

now open and secure. See Figure 2. 
 
 
 
 
 
 
 
 
 
 
 
 

Step 4 

Remove protective cap on the top of the umbrella canopy (A) and screw 
Double Flag Finial (C) into position. 
 
 
 
 

TM

 

Questions:  Call Customer Service at 888-329-3436 

Use “G” when wind is present 

x2 

Note: 
“E” ships separately 

Note: 
“J” and “K” ship separately 

Note: 40lb Sand Bag/Weight required but not included

 

Figure 1 

Figure 2 

 

Step 5 

Insert both Flags (D) into Double Flag Finial (C) 

– Position flags properly. 

 

 
Step 6 

Slide 34” black pvc post (F) into the bottom of the Sign Mount (E)  and tighten 1” from 
the top of the pvc post. This position will allow for the Stop/Slow Signs to sit 6’ off the  
ground. See Figure 3. 
 
 
 
 
 
 
 
 
 

Step 7 

While the umbrella canopy (A) is on the ground 

– Slide the Sign Mount and pvc post 

(E&F) onto the umbrella pole. Make sure the entire post slides past the push  
button and up the pole. See Figure 4. 

Figure 3 

Figure 4 

FRON

T

 

FlaggerJoe

 

FRONT PAGE 

Reviews: