I
NSTALLING
H
ARDWARE
OCP M
EZZANINE
B
OARD
2-26
2.11 OCP Mezzanine Board
Removing a OCP Mezzanine Board
1. Remove the system from the rack to power it down.
2. Remove the top cover. See
3. Remove the screws securing the OCP assembly to the chassis.
4. Remove the screws securing the OCP assembly to the standoffs on the chassis.
Figure 2-28.
Removing the OCP Mezzanine Board
CAUTION!
E
NSURE
ALL
POWER
IS
DISCONNECTED
FROM
THE
SYSTEM
BEFORE
PROCEEDING
.
!
Summary of Contents for QuantaGrid Series
Page 56: ...INSTALLING AN OCP MEZZANINE BOARD INSTALLING HARDWARE 2 31...
Page 155: ...This page left blank intentionally...
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ...A VCCI A A...
Page 166: ...A VCCI A A...
Page 167: ......