54

Energy Meter Installation

Model name

Q.VOLT to Energy Meter

HCORE5001H / HCORE5001A

1 2

1 2

1: RS485_NEG → 9: A−

2: RS485_POS → 8: B+

QCORE5001H / QCORE5001A

1 2

1 2

1: RS485_NEG → 9: A−

2: RS485_POS → 8: B+

Energy Meter Settings

 

Measure: c

 

SYS: 2P

 

ModBus Address: 1 (default value) 

 

Baud Rate: 115200

Note

Open the sliding terminal cover, to connect the wire, and close the cover until you hear a clicking sound.

Summary of Contents for Q.HOME CORE H5

Page 1: ...INSTALLATION MANUAL Q HOME CORE H5...

Page 2: ...y Labels 7 2 5 Disposal 8 3 Product Overview 9 3 1 Unpacking 9 3 2 Package Contents 10 3 3 Q VOLT Overview 12 3 4 Q SAVE Overview 13 3 5 Specifications 14 3 6 Network System Diagram 16 4 Installation...

Page 3: ...2 Connecting the Load and Grid Cables 29 9 Communication Connection 31 9 1 Internet DRM Connection 31 9 2 Energy Meter Connection 33 10 Closing the Covers 34 11 Battery Connection 35 11 1 Connecting t...

Page 4: ...Q HOME CORE 61 14 2 Checking the LED indicator 61 14 3 Using the Dark Start button 62 15 Commissioning the System 63 15 1 Connecting to the System 63 15 2 Local Commissioning with the Q OMMAND GO App...

Page 5: ...ollow the instructions in this manual 1 2 Target Group Electricians and qualified technicians who are allowed to install and to connect electrical systems 1 3 Symbols Used in This Manual WARNING This...

Page 6: ...information on proper use of this device contact the Qcells Service Hotline 2 2 Safety Precaution The following safety precautions and the warning messages described in this section must be observed...

Page 7: ...from entering inside during installation and wiring 2 3 Earth Fault Alarm When an earth fault occurs the inverter stops operation and the buzzer operates for 2 minutes Note This feature is only suppo...

Page 8: ...duct 2 Disposal of Q SAVE When this crossed out wheeled bin symbol is attached to batteries accumulators of your product it means they are covered by European Directive 2006 66 CE This symbol may be c...

Page 9: ...determined by the EMS algorithm 3 1 Unpacking CAUTION The Q VOLT weighs about 37 5kg and Q SAVE weighs about 61 1kg Therefore special care is required when handling At least two people have to carry...

Page 10: ...not operate with other components not approved by Qcells Connecting other products to Qcells products may result in abnormal operation 1 Q VOLT Package Contents QuickGuide Q VOLT Inverter 1EA Mountin...

Page 11: ...m 1EA BMS Battery Management System communication cable 0 6m 1EA 3 Options Wi Fi dongle Stand for floor mount Wi Fi LTE waterproof cover Energy Meter EM24 EM112 BMS communication extension cable 1m mu...

Page 12: ...and Load port 2 LED indicator 9 Communication port 3 Inner cover 10 BMS Connector 4 Wiring cover 11 USB Port 5 Battery power connector 12 LAN DRM port 6 PV switch 13 Wi Fi LTE Dongle port 7 PV connect...

Page 13: ...Product Overview 3 4 Q SAVE Overview 7 8 9 2 1 3 5 6 4 1 Front cover 6 BMS board 2 Inner cover 7 Battery DC Switch 3 Wiring cover 8 Battery Power Connector 4 Battery module 9 BMS Connector 5 Relay boa...

Page 14: ...Online update Energy Management System Integrated Country of Manufacturer Republic of Korea PV DATA DC Max Input Usable Power kWp 8 0 4 0 per MPPT Max Input Voltage VDC 600 Start Input Voltage V 120 t...

Page 15: ...CY MPPT Efficiency 99 9 Max Efficiency PV to Grid 97 Max Efficiency PV to Battery 97 8 Max Efficiency Battery to Grid 96 3 BATTERY UNIT DC Battery Technology Lithium ion NCA Samsung SDI Battery Energy...

Page 16: ...IN BAT IN BAT OUT BAT OUT BMS OUT CAN BMS OUT CAN BMS IN CAN BMS IN CAN BMS IN CAN USB Wi Fi Dongle Q VOLT Main Load L PE N 2 TT Network System Single Phase PE PV 1 PV 2 LAN DRM RS 485 GRID LOAD PV1...

Page 17: ...Fi Dongle Q VOLT BAT IN BMS IN CAN BAT IN BAT IN BAT OUT BAT OUT BMS OUT CAN BMS OUT CAN BMS IN CAN BMS IN CAN 4 TT Network System Three Phase Circuit Breaker PE PV 1 PV 2 LAN DRM RS 485 GRID LOAD PV1...

Page 18: ...or malfunctions due to this the product may be excluded from the warranty Make sure the installation site meets the following conditions Not in areas where highly flammable materials are stored Not in...

Page 19: ...tion requirements 4 2 Installation Space For effective heat dissipation there must be sufficient distance from surrounding objects and sufficient space for cabling work is required 300mm 300mm 300mm 3...

Page 20: ...he PV module inverter and battery system must be performed by certified personnel Wear safety gloves and protective clothing while working Wear the following safety gear when installing the product In...

Page 21: ...required to install the Q HOME CORE H5 system Torque screwdriver Phillips screwdriver bit Hex key bit Phillips head screwdriver Flat head screwdriver Torque wrench Wire stripper Tape measure Drill Se...

Page 22: ...mm 2 Insert an anchor into the hole and fix the bracket with a bolt Use the wall mount bolts included in the package At least 4 bolts are required to secure the bracket Anchor bolt 10N m 100kgf cm M8...

Page 23: ...d legs Use the wall mount bolts included in the package The anchor is not needed Remove the anchor from the wall mount bolt 3 Fix the stand on the floor Mounting hole 17 5mm Nut M12 to M16 not include...

Page 24: ...available for multi inverter configurations installed per site That includes but not limited to Qcells products and other manufacturer s products This may change in the future Please seek your local Q...

Page 25: ...7 Opening the Covers on page 27 6 2 Power Cable Specification The power cables must correspond to the AC DC input and output specifications for this product Cables are not included in the product pac...

Page 26: ...a 30mA or higher Type B RCD must be applied CAUTION It is must be used Type B RCD for Q HOME CORE optionally available Type A RCD can be optionally used for critical load only for the following manufa...

Page 27: ...ront Cover To remove the front covers from the inverter and battery packs After pressing the latch at the bottom of the cover raise the cover upward to open it 7 2 Opening the Wiring Cover Remove the...

Page 28: ...ipping the Load and Grid Cables The Grid and Load wire need to be stripped as follows Type Strip Length Grid PE L N PE 100mm 7 to 8mm 11 to 13mm 11 to 13mm L N 50mm Load PE L N PE 100mm 7 to 8mm 11 to...

Page 29: ...id Cables To connect the load and grid cables 1 Remove the sealing nuts from the load and grid glands 2 Remove the blind plugs from the load and grid glands Dipose of the blind plugs 3 Strip the cable...

Page 30: ...PE bolts 1 2 to 1 9N m If the L and N wires are a fine stranded conductor type raise the lever and insert the wire and then lower the lever to secure the wire If the L and N wires are a single solid...

Page 31: ...Mode Description DRM 0 The inverter is in the state of Key stop DRM 1 The import power from the grid is 0 DRM 2 The import power from the grid is no more than 50 of the rated power DRM 3 The import p...

Page 32: ...and sealing body LAN cable outer diameter 4 to 6mm 3 Push the cable through the side of the rubber seal 4 Insert the cable into the LAN DRM gland 5 Connect the RJ45 plug to the appropriate connector...

Page 33: ...AWG F 2 Strip the wires Strip length 7 to 8mm 3 Remove the terminal block from the RS 485 connector 4 Insert the wires to the terminal block Port 1 RS485_POS Port 2 RS485_NEG 5 Secure the wires to the...

Page 34: ...t be closed To close the covers 1 Close the wiring cover and tighten the 9 bolts Bolt M4 Torque 18kgf cm 15 6lbf in 2 Close the front cover a Insert the cover to fit into the grooves on the main body...

Page 35: ...ion Cables Use the BMS communication cable included in the product package 500 10 Connect the BMS communication cables to communicate with or control the battery packs as follows BMS IN BMS IN BMS OUT...

Page 36: ...ousing as follows Connector Sealing Body Sealing Nut To assemble the battery DC cable WARNING Steps from 2 to 5 must be observed If you don t follow the process properly it may lead to fire 1 Remove t...

Page 37: ...or more details about assembling the battery DC connector refer to the connector manufacturer s manual 2 Connecting the Battery DC Cables Connect the Battery DC Cables as follows BAT IN BAT IN BAT OUT...

Page 38: ...is on The termination resistance must be set only for the last battery connected If more than one battery is connected turn off all the termination resistance switches except the last battery OFF ON F...

Page 39: ...nectors are used 12 1 Assembling the PV Connector St ubli PV KBT4 6II UR PV KST4 6II UR is used for the PV connector Note For information about the PV cable specification see 6 2 Power Cable Specifica...

Page 40: ...connection of PV strings for the correct polarity and make sure the open circuit voltage does NOT exceed the inverter input limit 600V If PV open circuit voltage is higher than 600V the inverter will...

Page 41: ...nector in the inverter see 9 2 Energy Meter Connection on page 33 13 1 EM24 Carlo Gavazzi Three Phase 1 Energy Meter Wiring Grid Mains N L1 L2 L3 41 42 1 N L1 L2 Utility Meter 1 L3 PV INV Q HOME CORE...

Page 42: ...41 A 2 RS485_POS 42 B 4 RS485_POS 42 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 41 A 3 RS485_NEG 41 A 2 RS485_POS 42 B 4 RS485_POS 42 B 2 Energy Meter Settings Application F SYS 3P n P int t...

Page 43: ...M24 Carlo Gavazzi Single Phase 1 Energy Meter Wiring Grid Mains N L1 1 Utility Meter Main CB Q HOME CORE CB Load CB Critical Load CB Critical Load Main Load 1 2 N N L1 Q VOLT Load Off grid Grid RS485_...

Page 44: ...A 2 RS485_POS 42 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 41 A 2 RS485_POS 42 B 2 Energy Meter Settings Application F SYS 1P P int ti 1 ModBus Address 1 default value Baud Rate 9600 default value...

Page 45: ...3 EM112 Carlo Gavazzi Single Phase 1 Energy Meter Wiring N L1 2 1 Utility Meter Q HOME CORE CB Load CB Critical Load CB Critical Load Main Load Grid Mains N N L1 Main CB Q VOLT Load Off grid Grid RS4...

Page 46: ...2 1 2 1 RS485_NEG 3 5 A 2 RS485_POS 4 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 3 5 A 2 RS485_POS 4 B 2 Energy Meter Settings Measure b Tariff Yes Address 1 Baud Rate 9 6 Note For EM112 the total p...

Page 47: ...13 14 15 16 17 18 RS485 INPUT kwh kW h ToT Rx Tx RS485 INPUT Utility Meter P1 P2 CT P1 P2 CT P1 P2 CT Q HOME CORE CB Main CB P1 P2 CT P1 P2 CT P1 P2 CT PV INV Load CB Main Load Critical Load CB Criti...

Page 48: ...485_NEG 9 A 2 RS485_POS 8 B 4 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 9 A 3 RS485_NEG 8 B 2 RS485_POS 8 B 4 RS485_POS 9 A 2 Energy Meter Settings Measure C SYS 3P n Current Rat...

Page 49: ...i Single phase 1 Energy Meter Wiring Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 N L1 kwh kW h ToT Rx Tx 1 8 9 13 14 RS485 INPUT N Q HOME CORE CB Critical Load CB Load CB CT P1 P2 N N L1 Main CB...

Page 50: ...NEG 9 A 2 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 9 A 2 RS485_POS 8 B 2 Energy Meter Settings Measure C SYS 2P Current Ratio 20 ModBus Address 1 default value Baud Rate 115200 Note Ope...

Page 51: ...Utility Meter Q HOME CORE CB PV INV Critical Load CB PV CB Load CB Critical Load kwh kW h ToT Rx Tx 8 9 4 5 6 RS485 INPUT GND N 1 2 3 kwh kW h ToT Rx Tx N 1 2 3 8 9 4 5 6 RS485 INPUT GND Main Load Opt...

Page 52: ...9 A 3 RS485_NEG 9 A 2 RS485_POS 8 B 4 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 9 A 3 RS485_NEG 8 B 2 RS485_POS 8 B 4 RS485_POS 9 A 2 Energy Meter Settings Measure c SYS 3P n Mo...

Page 53: ...avazzi Single phase 1 Energy Meter Wiring Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 N L1 Grid Mains Utility Meter Q HOME CORE CB Critical Load CB Load CB kwh kW h ToT Rx Tx 8 9 4 RS485 INPUT G...

Page 54: ...1 RS485_NEG 9 A 2 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 9 A 2 RS485_POS 8 B 2 Energy Meter Settings Measure c SYS 2P ModBus Address 1 default value Baud Rate 115200 Note Open the sl...

Page 55: ...ter CT direction P2 Load P1 Grid S1 S2 CT for L1 S1 3 S2 1 CT for L2 S1 6 S2 4 CT for L3 S1 9 S2 7 Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 3 2 4 N L1 L2 L3 Utility Meter Optional Secondary Ene...

Page 56: ...001H HCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 25 B 3 RS485_NEG 25 B 2 RS485_POS 24 A 4 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 25 B 3 RS485_NEG 25 B 2 RS485_POS 24 A 4 RS485_POS...

Page 57: ...nergy Meter Wiring L N 1 2 9 10 N L1 Critical Load CB P1 P2 CT 1 2 Critical Load N N L1 Load CB Q HOME CORE CB Main Load Main CB CT direction P2 Load P1 Grid S1 S2 S1 9 S2 10 Q VOLT Load Off grid Grid...

Page 58: ...ation Model name Q VOLT to Energy Meter HCORE5001H HCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A 2 Energy Meter Settings ModBus A...

Page 59: ...t CHINT Single phase 1 Energy Meter Wiring L N 1 Type of wiring 1P2W 3 2 4 N L1 1 2 Critical Load N N L1 Main Load Utility Meter Grid Mains Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 Critical L...

Page 60: ...ation Model name Q VOLT to Energy Meter HCORE5001H HCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A 2 Energy Meter Settings ModBus A...

Page 61: ...by color and behavior are as follows LED Color LED Behavior Description Sky Blue Solid Charging or discharging in online mode Flashing Standby in online mode Magenta Solid Charging or discharging in o...

Page 62: ...Q HOME CORE when there are no PV and Grid Press the Dark Start button for about 10 seconds Once the power is supplied and the LED turns blue release the Dark Start button Once the inverter enters the...

Page 63: ...ssemble the Wi Fi LTE waterproof cover to protect the Wi Fi dongle from dust and water U S B 2 Using the USB Tethering 1 Connect the mobile device to the inverter with a USB cable U S B 2 Turn on the...

Page 64: ...droid iOS The app runs with the following versions or higher Check OS version of the mobile device Android 6 0 or higher iOS 11 0 or higher 2 Open the Q OMMAND GO app 3 Select WIFI or USB The WIFI sig...

Page 65: ...65 Commissioning the System 5 Set wired or wireless network 6 Check firmware update Wired Network Wireless Network 7 Check region and time 8 Set system parameters...

Page 66: ...y If there is any electricity remaining after that it reduces the electricity generation through PVs Time based Mode Controls the electricity in accordance with the preset schedule Controls the chargi...

Page 67: ...e top left corner 2 Tap Advanced Setting 1 10Min Avg Protection AU If the average system voltage for 10 minutes exceeds the detection level the inverter is blocked from the system within 3 seconds Par...

Page 68: ...utput until it reaches fTransition Level 2 If frequency exceeds FTransition it increases charging active power according to the increase in frequency until it reaches fPmin INVERTER POWER LEVEL P fULC...

Page 69: ...1 and it does not exceed the designated active power output constraint W4 above VW2 MAXIMUM POEWR LEVER P S rated 0 20 40 60 80 100 120 V W1 V W2 INVERTER VOLTAGE V W4 Parameter Default Values of Volt...

Page 70: ...s set to 0 5 Volt Var Q Volt var response mode AU A volt var response mode changes reactive power absorbed or supplied by an inverter depending on system voltage The response curve needed for the volt...

Page 71: ...ion Hard Limit If the inverter output active power exceeds the Generation Hard Limit for 15 seconds the inverter is blocked from the Generation Hard Limit Time system Generation Soft Limit If the inve...

Page 72: ...Start frequency Hz 50 2 50 2 to 50 5 10 Fixed cos DE You can set the inverter output power factor as well as leading over and lagging under of reactive power Parameter Default Values Range Cos Value 1...

Page 73: ...of Q OMMAND The appropriate region and grid code must be selected because grid protection settings and power quality response modes may vary by region To check the region or grid code setting 1 Tap on...

Page 74: ...nstalled the DC switch on the hybrid inverter must remain switched on to avoid deep discharge of the battery Alternatively the device can also be switched off completely 16 1 Turning Off Q HOME CORE T...

Page 75: ...tches you can lock the switches with a padlock for safety if needed 1 Locking the DC Switch When the battery DC switch is off the switch can be locked with a padlock 2 Locking the PV Switch To lock th...

Page 76: ...tools with insulated handles and wear rubber gloves eye protection glasses and boots when working with the battery systems Do not lay tools or metal parts on top of batteries Disconnect charging sour...

Page 77: ...nd qcells com Note If you don t have an account please register as an installer account 18 2 Q OMMAND PRO App The app runs with the following versions or higher Check OS version of the mobile device A...

Page 78: ...ician When a system failure occurs do not arbitrarily repair the product or replace a component Hanwha Solutions is not responsible for any problems caused by arbitrary repair If there is an error aft...

Page 79: ...79 MEMO...

Page 80: ...q cells eu TEL 61 0 2 9016 3033 WEB www qcells com au Hanwha Solutions Corp Qcells 86 Cheonggyecheon ro Jung gu Seoul Korea 04541 Hanwha Q CELLS GmbH Sonnenallee 17 21 Bitterfeld Wolfen OT Thalheim 06...

Reviews: