AS65 Conveyors | Installation & Maintenance Instructions
11
Maintenance
Belt Tracking
>
For best results, make adjustments to only one side.
u
Belt Tracking at Infeed and Outfeed Pulleys
u
Belt Tracking at Tail End
1
Starting at infeed idler pulley,
rotate adjustment screw on
side where adjustment is needed.
2
Let belt make several rota-
tions to ensure proper track-
ing. (Proper tracking is achieved
when belt can make a full revolu-
tion without contacting either side
of frame.)
1
Rotate adjustment screw on
side where belt is riding too
close.
2
Let belt make several rota-
tions to ensure proper track-
ing. (Proper tracking is achieved
when belt can make a full revolu-
tion without contacting either side
of frame.)
u
Belt Tracking at Drive End
3
x
3
x
1
Loosen three driver assembly
screws on each side of bear-
ing block.
2
With conveyor running, rotate
square head tracking screw
toward drive pulley on side where
belt is riding too close.
3
Let conveyor make several
rotations to ensure belt is
tracking properly.
4
Retighten driver assembly
screws. (Three on each side)
The Drive End is tracked when the belt can make a full revolution without contacting either bearing plate.