
Q-Free
ITS-950 ParQSense Base station Installation Manual
Page 7 of 12
Verify cable pathways and lengths of cables to ITS-950 ParQSense Base Station location.
Attaching the pole mount bracket to the ITS-950 ParQSense Base Station
Mounting the pole mount bracket with ITS-950 ParQSense Base Station to the chosen pole
location
Connecting the POE cable for power and communication.
3.4 Back end system communication
The ITS-950 ParQSense Base Station will connect to the provided hard wired network connection. The
following should be complete prior to installing the Base station on site:
Provide and verify network connectivity at the PoE device location and at the proposed ITS-950
ParQSense Base Station installation location.
The ITS-950 ParQSense Base Station can optionally use cellular for connection and communication to
the back end. If this communication method is specified for project the following should be complete prior
to installing the Base station on site:
Verify cellular provider network has acceptable signal in the proposed ITS-950 ParQSense Base
Station installation location.
Details will be provided the next revision to this document.
3.5 Safety guidelines
Always wear proper eye protection when required by local regulations. Always read and follow all
instructions and safety precautions provided by manufacturer of all equipment. Verify safe procedures with
local authorities. Always be aware and follow safe installation procedures on “live” roads. Check local
licensing and documentation requirements prior to any installation. Follow all applicable local laws and
regulations.