INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.2_G11.6 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.2_G11.6 – Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. 
Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions.

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules.

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project.

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar power 
system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system.

Other applicable documents

In addition to this Manual following technical information are 
relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

1  INTRODUCTION

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO XL-G11.2
Q.PEAK DUO XL-G11.6

Type

Q.ANTUM DUO Z

Length

2416 mm

Width

1134 mm

Frame height

35 mm

Area

2.74 m²

Weight

31.3 kg

Max. system voltage V

SYS

1500 V  (IEC) / 1500 V  (UL)

Max. reverse current

25 A

Permissible 

temperature range

–40 °C to +85 °C (–40 °F to +185 °F)

Junction box 

protection class

≥ IP67 with bypass diode

Connector protection class

IP67 or IP68

Fire rating

C

Max. test load Push / Pull

1

5,400 Pa / 2,400 Pa

Max. design load Push / Pull

1

3,600 Pa / 1,600 Pa

Middle rail

Yes

Certificates

Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016; PV 
module classification: Class II; QCPV Certification ongoing.

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

Fig. 1: 

External dimensions (in mm) and components for 
Q.PEAK DUO XL-G11.2 and Q.PEAK DUO XL-G11.6

1134 mm

1400 mm

2416 mm

790 mm

35 mm

4 × Mounting slots (DETAIL A)

Frame

1092 mm

AU/
EN

Label

4 × Grounding holes, Ø 4.5 mm

4 × Drainage holes

≥ 750

 mm

8 × Mounting slots system Tracker (DETAIL B)

DETAIL A

16 mm

8.5 mm

21

 mm

DETAIL B

10 mm

7 mm

22

 mm

1090 mm

≥ 350

 mm

400 mm

508 mm

4 × Drainage holes

2.8 × 6 mm  

4 × Drainage holes

3 × 6 mm  

Summary of Contents for Q.PEAK DUO XL-G11.2 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G11 2 and Q PEAK DUO XL G11 6 solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...uch as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and r...

Page 3: ...andpermitrequirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data shee...

Page 4: ...cessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ens...

Page 5: ...th burrs or sharp corners must not be placed near the module backside so as not to touch the laminate under load Ensure that the junction boxes do not touch the mounting structure e g shorts rails bal...

Page 6: ...dules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse curre...

Page 7: ...shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger R...

Page 8: ...ult in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradia...

Page 9: ...d skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 co...

Page 10: ...TER INSTALLATION Protective Grounding The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric shock Do not attempt to fix any proble...