2. Operation
2.1 Package Content
•
Requested TAKHI light source
•
Power source: input 100 - 240 V~, 50 - 60 Hz; output 12 V, 5.5 A;
99 x50 x33 cm, cord length 1.5 m.
•
Power cord 1.85 m long
•
User’s manual
Inspect carefully the devices and make sure there is no damage. On the contrary, do
not employ the light source and please contact us through
for
repair or replacement information.
2.2 Operating instructions
Insert the plug of the power cord into the power supply and connect the power cord
to the power outlet. Then, introduce the plug of the power supply into the light source
power input (DC female type).
Unscrew the cap of the SMA 905 connector on the front face of the light source and
connect the fibre cable. Always do this step before turning on the light source.
Finally, turn on the light source (MODE control switch to the
‘ON’
position) and wait
for 25 minutes until the light source reaches the thermal equilibrium and the output
power is stabilized. Now, the TAKHI light source is ready to be used.
In order to turn off the light source, move the switch to the
‘OFF’
position.
1
MODE
(ON-OFF)
2
Power input
(12V, 4.5A max)
3
SMA 905
output connector
7
3. Maintenance
3.1 Cleaning of the output connector
The output connector of the light source should be periodically cleaned employing
compressed air to remove the dust. It is recommended to have the output connector with
the cap on it whenever the light source is not being used. The connector of the fiber used
with the light source also has to be clean to ensure the best possible performance.
2.3 TAKHI-series diagram
Left side
Right side
2
1
3