4.
System Debug
This system debug is for BESS system (Battery Energy Storage System). BESS system can’t do the
debug alone. It must operation with configured UPS, PCS and EMS system together.
Debug Step
Content
Prepare of debug.
Turn on the BESS system, refer to chapter 3. Before turn on the whole
BESS system turn on the load is
not allowed!
Remark: Except the BESS, if other equipments have its own system turn
on step, must follow its own system operation menu.
System function test.
Each component system debug:
Power supply
from the External Power Suppler (e.g. UPS) is working
normally.
Communication Test:
Check the communication between the BESS
system and communicated devices normal or not, has alarm or not.
Power Conversion System Test:
Before conjoint test must test the
Inverter System turn on progress at first. And check the parameters
meet BESS requirement or not.
BESSTest:
Charge/Discharge test; Test stop charging, stop discharging,
current limiting functions, etc.
Caution:
Before turn on the BESS system must setup all the parameters
of the PCS and EMS at first.
Monitor function test.
(If configured.)
Check the data of the BESS system is showing on the monitor system
normally.
EMS conjoint test
(If configured.)
If the EMS system has running monitor requirements, checks the BESS
system take action when the EMS send out the instructions.
Trial operation test.
After the system debugged, run the system a period as test (testing
with low load), to test the high voltage DC system is fit for the contract.