6. Operation
6.1 Start Up Procedure
!
WARNING
Before turning on the inverter, ensure that the front panels are closed properly.
To start the inverter, complete the following steps in order:
1.. Prior.to.engaging.the.disconnect.switches,.check.the.polarity.of.the.DC.positive.and.
negative.connectors.to.ensure.they.are.wired.correctly.and.confirm.the.PV.panel.
open.circuit.voltage.is.at.or.below.600.VDC.
2.. Close.the.external.panel.doors.
3.. Turn.on.the.external.AC.connection.to.the.inverter.
4.. Turn.on.the.external.DC.disconnect.to.provide.DC.power.to.the.inverter.
5.. Turn.the.ON/OFF.switch.to.the.OFF.position.
6.. Turn.the.inverter’s.AC.disconnect.to.the.power.ON.position..Refer.to.Figure.6-1.
The display on the upper front panel should now be active. The display is shown
in Figure 6-3.
7.. Turn.the.inverter’s.DC.disconnect.to.the.power.ON.position..Refer.to.Figure.6-1.
8.. Turn.the.ON/OFF.switch.to.the.ON.position.
After five minutes, the inverter starts to produce power into the AC grid if all necessary
operating conditions are met.
OPERA
TION
Summary of Contents for PVP260kW
Page 1: ...97 600100 24 B02 PVP260kW Inverter INSTALLATION OPERATION MANUAL ...
Page 2: ......
Page 4: ...ii ...
Page 6: ...iv ...
Page 8: ...vi ...
Page 48: ...36 ...
Page 62: ...50 ...
Page 86: ...74 ...
Page 87: ...75 Appendix C Mechanical Drawings Figure C 1 Mechanical Drawings APPENDIX C ...
Page 88: ...76 Figure C 2 Mechanical Drawings ...
Page 94: ...82 ...
Page 96: ...84 ...
Page 104: ...92 Notes ...
Page 105: ......
Page 106: ...PO Box 7348 Bend OR 97708 P 541 312 3832 www pvpowered com ...