Installation Guide / PostMount 1-A with ECO-Rail
9
Code-Compliant Planning and Installation Guide V 2.2 - Complying with AS/NZS1170.2: 2011 ADMT 4-2016
- Certification -
Gamcorp (Melbourne) Pty Ltd A.C.N 141 076 904 A.B.N 73 015 060 240
www.gamcorp.com.au
Suite 4, 346 Ferntree Gully Rd, Notting Hill VIC 3168 Tel: 03 9543 2211
Table 1 – Maximum Tilt Angle and Footing Options
Wind Region
Region A
Region B
Region C
Region D
Wind speed (m/s)
41
48
59
73
Maximum tilt angle (
°
)
60
60
50
20
Soil Type
Post embedded in concrete pier:
300 mm diameter concrete piers minimum depth (m)
Hard class soil
[Gravels; dry (hard) clays]
0.80
0.90
1.00
0.80
Very Firm class soil
[Dry (stiff) clays; clayey sands; coarse
sands; compact sands]
0.85
0.95
1.10
0.85
Firm class soil
[Damp clays; sandy clays; damp sands]
0.95
1.05
1.20
0.95
Soft class soil
[Wet clays; silty loams; wet or loose sands]
1.15
1.25
1.40
1.15
ISO 9001:2008 Registered Firm
Certificate No: AU1222
8762 - Compliance Letter PM1-A - calc4.2.odt
Page 2 of 3