3
INSTALLATION
3.1
Installation ESP 1500/ESP 3000/ESP 4500
Check that the suspension construction is adequate prior to installing the product. Mount the
ESP 1500/ESP 3000/ESP 4500 unit in the ducting system. It can be supported by a suspension
bracket (see fig 3.1A) as well as suspension by screw rods attached to the top of the
ESP 1500/ESP 3000 unit (see fig. 3.1B). It is necessary to drill holes on the upper side for this
purpose. It is also possible to place the unit on the ground.
Please consult the electrical diagram when connecting the air cleaner to the mains. Use suitable
rubber or neoprene. Beware of possible differences in the mains power supply. The air cleaner can
be stacked to a maximum of four units; the perforations and protrusions on the housing can be
used for this purpose.
A
B
Figure 3.1
If the buyer wants to exercise warranty for
product purchased, it is necessary to ultimate buyer
sign a maintenance contract for el. filter with an authorized service JAK-KA Group. Otherwise, the
guarantee does not apply to sell the device.
ESP