Pure line PL2605 Installation And User Manual Download Page 14

V-Green 165 Quick Start Guide (Default Schedule) 

 

The V-Green quick start up uses the factory default schedule. The following table 
describes the factory settings for DURATION and SPEED order. 
 

Button 

Duration 
(in Hours) 

Speed 
(in RPMs) 

Step 1 

3100 

Step 2 

2600 

Step 3 

1850 

OVERRIDE 

3450 

 

Pressing the START key will start the V-Green 165 motor based on the factory default 
schedule.  
 

NOTE

: If power is cycled to V-Green 165 motor and the user does not press the STOP 

key, the V- Green 165 motor will automatically start and run the programmed default 
schedule shown in the chart above. This feature ensures that the V-Green motor will 
restart in the event of a power outage.  

 
V-Green 165 Quick Start Guide (Custom Schedule) 

 

If the User prefers their own scheduling over the default schedule defined by Century, 
the user has the option to set the program DURATION and SPEED for  STEP 1, STEP 
2, STEP 3, and the OVERRIDE keys.  
 

NOTE

: The V-Green motor must be stopped (Press STOP key) for programming 

DURATION and SPEED of the STEP  1, STEP 2, and STEP 3 keys. OVERRIDE 
DURATION and SPEED can be programmed when the V-Green 165 is either stopped 
or running. 

 
 
 
 

PURELINEPOOL.COM

    TEL: 407-834-2200 

13 

Summary of Contents for PL2605

Page 1: ...Prime 1 65 VS INSTALLATION AND USER GUIDE Model PL2605...

Page 2: ...est and most reliable motors Failure to read and follow instructions can result in serious injury To prevent potential injury to self or product and to avoid unnecessary service calls please read manu...

Page 3: ...ted by a ground fault circuit interrupter GFCI Contact a qualified technician if you cannot verify if the circuit is protected by a GFCI Pump must be permanently connected to a GFCI WARNING The pump i...

Page 4: ...a strong vacuum at the main drain at the bottom of your swimming pool spa This suction is so strong that it can trap adults and children under water if they come in close proximity to the drain The u...

Page 5: ...tem operates under hazardous pressure Please stand clear of circulation system during pump start up Before servicing your pool equipment make sure all systems and pump controls are in the off position...

Page 6: ...er Pump Same dimensions as the Hayward Super Pump means no realigning of plumbing significantly reducing the time it takes to swap out your pump Paired with Century s V Green motor the most reliable p...

Page 7: ...Easy access to all internal parts for servicing Product Dimensions Pump Performance Chart PURELINEPOOL COM TEL 407 834 2200 6...

Page 8: ...all the pump more than 10 feet above the water level 3 Select a well drained area one that will not flood during the rain 4 Do NOT install pump in a damp or non ventilated location 5 Install the pump...

Page 9: ...tub structure and to all electrical equipment metal conduit and metal piping within 5 feet 1 5 m of the inside walls of a swimming pool spa or hot tub when the motor is installed within 5 feet of the...

Page 10: ...sing overload tripping and a reduced component life If the voltage is running at less than 90 or more than 110 of rated voltage when motor is running t full load consult power company Grounding and Bo...

Page 11: ...maximizes energy consumption Pool size water features and environmental factors will affect optimal programming necessary to maximize energy conservation WARNING The V Green 165 is for use with 208 2...

Page 12: ...pending on your pump s location Ability to configure prime speed and prime duration Ability to configure freeze protection temperature Ability to view actual speed and power of the V Green 165 in real...

Page 13: ...ing system If the water source is higher than the pump the pump will prime itself when the suction and outlet valves are open If the water source is lower than the pump unscrew and remove the strainer...

Page 14: ...otor will automatically start and run the programmed default schedule shown in the chart above This feature ensures that the V Green motor will restart in the event of a power outage V Green 165 Quick...

Page 15: ...EP 2 STEP 3 or OVERRIDE key Repeat Steps 1 4 to program the corresponding DURATION and SPEED for each button 6 Press START to run the V Green 165 motor based on the programmed 24 hour schedule 7 Press...

Page 16: ...he event of a breach of warranty within the applicable warranty period Pureline Products shall have the option of 1 repairing 2 supplying an identical or similar replacement or 3 refunding for the pur...

Reviews: