background image

customerservice

@

puregbi.com

1-866-498-5269

MODEL# 9011TS  -  PAGE 10

C-Hook

ASSEMBLY INSTRUCTIONS

Step 9:

Attach all 36 Springs Hook ends 
(Part #7) using the Spring Loading 
Tool (Part #16) to all Top Rail 
Openings by following the correct 
placement order. The R-Hook end 
should be attached to Trampoline 
Mat, and C-Hook to Top Rail.

For even distribution of tension 
and ease of assembly, springs 
should be placed on opposite 
sides of the mat/frame. Attach 
springs 1-18 in the correct 
numerical order to properly 
distribute tension of the mat.

Once the first 18 springs have 
properly attached to all Top Rails, 
install the remaining springs 
to complete the instalation of 
the trampoline mat onto the 
foundation.

Step 10:

Tie down the all elastic straps 
attached to the trampoline pad into 
the the top rails tightly.

 

17

 

 
 
 
 
 
 

 
 
 

STEP 7 

Lay out the Trampoline Mat with Safety Pad (#1) inside the frame with Safety Pad flip up as shown in FIGURE 7. 
There are total of 36 Triangle-rings sewn on the mat, and 36 holes on the Top Rail Frame. None are numbered so please 
follow the instructions carefully to ensure proper installation.    Now, select an arbitrary point on the Top Rail Frame (call it 

ZERO) as shown in FIGURE 

7

 

SPRING LOADING INSTRUCTION 

CAUTION 

 

Make sure to flip up the safety pad for ease of installation of springs. 

 

Two adults are required in this assembling step. 

 

CAREFUL - When attaching the springs, please do not put your hands, legs, or body close to the connector points. 
The connector points can become pinch points since the trampoline is tightening up.   

 

Wear heavy duty working gloves to protect your hand.     

 

Use the special spring loading tool included.     

 
 
       
 

STEP 8 

Attach the R-Hooked Galvanized Spring (#8) with 

R

 Hook end to the Triangle-Ring on the mat as shown below.

 

HINT:

 Holding the spring at 45 degree in relation to the mat surface will be much easier to install into Triangle -Ring.

 

SPRING LOADING TOOL (9) 

Hold the spring loading tool underhand and pull spring hook towards the point “ZERO” on the Top Rail frame as shown

 in 

FIGURE 8. Drop hook into frame hole until it latches on completely and tap it down if hook is not completely in the hole.   

 

 
 
 
   

   

   

        

 

 

 

  

 
 

FIGURE 8 

R

 HOOK END 

SPRING (#8) 

POINT ZERO

SPRING LOADING TOOL(#9)

 
 
 
 
 
 
 
 
 
 
 

ZERO 

 
FIGURE 7 
 

 

18 

 
Then, attach a springs at the Corners Top Rail (#3) first as shown in FIGURE 9.    For even

 

distribution of tension and ease 

of assembly, springs should be placed on opposite sides of the mat/frame

..i.e. 5, 6 then 23, 24; Zero, 35 then 17, 18, etc.     

Now, you should have 12 springs install at ZERO, 5, 6, 11, 12, 17, 18, 23, 24, 29, 30, and 35. 

 
                          
 
 
 

 

 
 
 
 
 
 
 
 

STEP 9 

Attach

 a spring 

at every 3 holes and corresponding Triangle-rings. For even

 

distribution of tension and ease of assembly, 

springs should be placed on opposite sides of the mat/frame

..i.e. 3 then 21, 33 then 15, etc. In addition to the previously 

installed springs, you should have springs at 3, 9, 15, 21, 27, and 33 as shown in FIGURE 10. 

 

 
 

 

 
 
 
 
 
 
 
 
 
 

FIGURE

 

10 

FIGURE 9 

(#

 

1) 

 

(#

 

1) 

 

                                                               

CAUTION: 

If you notice that you have miscount a hole and Triangle-rings connection, recount and remove or attach any springs 
required to maintain the count of springs. 

 

 

 

18

 

18 

 
Then, attach a springs at the Corners Top Rail (#3) first as shown in FIGURE 9.    For even

 

distribution of tension and ease 

of assembly, springs should be placed on opposite sides of the mat/frame

..i.e. 5, 6 then 23, 24; Zero, 35 then 17, 18, etc.     

Now, you should have 12 springs install at ZERO, 5, 6, 11, 12, 17, 18, 23, 24, 29, 30, and 35. 

 
                          
 
 
 

 

 
 
 
 
 
 
 
 

STEP 9 

Attach

 a spring 

at every 3 holes and corresponding Triangle-rings. For even

 

distribution of tension and ease of assembly, 

springs should be placed on opposite sides of the mat/frame

..i.e. 3 then 21, 33 then 15, etc. In addition to the previously 

installed springs, you should have springs at 3, 9, 15, 21, 27, and 33 as shown in FIGURE 10. 

 

 
 

 

 
 
 
 
 
 
 
 
 
 

FIGURE

 

10 

FIGURE 9 

(#

 

1) 

 

(#

 

1) 

 

                                                               

CAUTION: 

If you notice that you have miscount a hole and Triangle-rings connection, recount and remove or attach any springs 
required to maintain the count of springs. 

 

 

 

18

 

19 

 
 
 
 
 
 

 

STEP 10 

Then, attach the remaining 18 springs by using the same theory of counting equal holes as shown in FIGURE11. 
       
 
 
 
 
 
 
 
 
 
 
 
 

 

STEP 11 

Flip down the Safety Pad stitched with the trampoline mat (#1).    Pull tight the elastic straps over the frame as shown in 
FIGURE 12 and make sure safety pad covers the frame.     
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

Perform a complete inspection of the trampoline to make sure all parts are assembled and attached properly. 

FIGURE 11

 

(#

 

1) 

 

ELASTIC STRAP 
 

Trampoline Pad 
(In lift-up position) 
 

FIGURE 12

 

Read this entire manual and make sure all jumpers completely understand all of the safety rules printed in the manual and 
on the various warning signs. Instruct all jumpers in the basic bounces 

described

 in the manual. 

 

!

IMPORTANT NOTICE:

 Make sure the safety pad is securely attached to the frame and completely covers the 

frame and all springs before using this trampoline. Do not use trampoline if even one spring or Triangle-ring is damaged or 
missing. 

 

1

2

3

4
5

7

8

9

10

11

12

13

14

15

16

17

18

6

 

19 

 
 
 
 
 
 

 

STEP 10 

Then, attach the remaining 18 springs by using the same theory of counting equal holes as shown in FIGURE11. 
       
 
 
 
 
 
 
 
 
 
 
 
 

 

STEP 11 

Flip down the Safety Pad stitched with the trampoline mat (#1).    Pull tight the elastic straps over the frame as shown in 
FIGURE 12 and make sure safety pad covers the frame.     
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

Perform a complete inspection of the trampoline to make sure all parts are assembled and attached properly. 

FIGURE 11

 

(#

 

1) 

 

ELASTIC STRAP 
 

Trampoline Pad 
(In lift-up position) 
 

FIGURE 12

 

Read this entire manual and make sure all jumpers completely understand all of the safety rules printed in the manual and 
on the various warning signs. Instruct all jumpers in the basic bounces 

described

 in the manual. 

 

!

IMPORTANT NOTICE:

 Make sure the safety pad is securely attached to the frame and completely covers the 

frame and all springs before using this trampoline. Do not use trampoline if even one spring or Triangle-ring is damaged or 
missing. 

 

PARTS NEEDED:

 

Trampoline Mat (Part #1), Spring Hook (Part #7), Spring Loading Tool (Part #16)

R-Hook

Opening

Spring(#7)

(#1)

(#1)

(#1)

Elastic Strap

Step 9

Step 10

Summary of Contents for 9011TS

Page 1: ...nning any exercise program or strenuous activity ADULT ASSEMBLY REQUIRED Please visit www pureglobalbrands com to register your product to ensure warranty coverage WARNING THE CONTENTS OF THIS PACKAGE ARE NOT SUITABLE FOR CHILDREN UNDER 3 YEARS OF AGE CONTAINS SMALL PARTS WHICH MAY CAUSE CHOKING 120 LBS MAXIMUM WEIGHT RATING PURE FUN USER MANUAL 7 TRAMPOLINE ENCLOSURE SET MODEL 9011TS SIMPLY GOOD ...

Page 2: ...for children under 3 years of age ADULT ASSEMBLY REQUIRED WARNING While every attempt is made to ensure the highest degree of protection in all equipment we cannot guarantee freedom from injury The user assumes all risks of injury due to use All merchandise is sold on this condition which no representative of the company can waive or change ...

Page 3: ...ons or concerns about this Pure Global product please e mail the Pure Global Brands Inc customer service department at customerservice puregbi com or contact us at 1 866 498 5269 You can also visit our website at www pureglobalbrands com If you request replacement parts please be sure to include the following information in your correspondence YOUR NAME YOUR MAILING ADDRESS YOUR EMAIL ADDRESS RETA...

Page 4: ...use improper or abnormal usage or repairs not provided by a Pure Fun authorized service center or for products used for commercial or rental purposes This warranty does not cover ordinary wear and tear weathering failure to follow directions improper installation improper maintenance or acts of Nature such as damage caused by wind lightning snow water or ice Weather damage damage caused by unautho...

Page 5: ...ren to wear loose fitting clothing clothing with straps loops backpacks or wear and or hold accessories with straps or loops or any article of clothing or accessory with sharp edges which may present a hazard or become snagged or caught on the Trampoline during use Serious injury and or accidental strangulation may occur DO NOT allow children to sit or stand on the frame pad edge or attempt to han...

Page 6: ...EST Monday Friday IMPORTANT USE GLOVES TO PROTECT AGAINST PINCH POINTS DURING ASSEMBLY Enclosed are the current specifications and product features available at time of printing however changes may be made in equipment availability specifications and features without notice Tools Required Included Spanner Wrench Allen Wrench Spring Tool PRIOR TO ASSEMBLING HARDWARE LIST HARDWARE USE FOR TRAMPOLINE...

Page 7: ...10 TSP88 Safety Instruction Placard 1 PARTS LIST USE FOR ENCLOSURE Key Number Description Quantity 11 EST 88 3A 25 4 Straight Frame Tube with Foam 6 12 ECT 88 3A 25 4 Curve Frame Tube with Foam 6 Parts Parts 13 EHT 88 3A 25 4 Horizontal Tube with Foam 3 14 EN 88 3A Enclosure Netting 1 LIST USE FOR TRAMPOLINE er Description Quantity TMSP 88 36 28 Trampoline Mat stitched with Triangle Rings and Safe...

Page 8: ... Extension Part 4 and twist the plate until firmly attached Finish attaching the plastic plates to the remainder of the Vertical Legs Extensions Step 2 Insert all Vertical Leg Extensions to Plastic Horizontal Leg Base Part 6 to circular openings Step 4 Insert the Plastic Vertical Leg Extension Part 5 into the standing leg extensions Bottom emboss should fit securely into Horizontal Leg Base Step 3...

Page 9: ...rt 14 and Allen Wrench Part 19 to tighten the screw into place Tighten remainder of pieces until all hardware is secure into Corner Top Rails Inside 8 8 2 2 Outside Step 7 Connect Top Rails Part 2 to all Corner Top Rail Sockets to create the foundation of the trampoline Step 5 Step 6 Step 7 Step 8 Step 8 Place Jumping Mat Part 1 on Vertical leg extensions by placing all 6 corresponding edge openin...

Page 10: ...ld be placed on opposite sides of the mat frame i e 5 6 then 23 24 Zero 35 then 17 18 etc Now you should have 12 springs install at ZERO 5 6 11 12 17 18 23 24 29 30 and 35 STEP 9 Attach a springat every 3 holes and corresponding Triangle rings For even distribution of tension and ease of assembly springs should be placed on opposite sides of the mat frame i e 3 then 21 33 then 15 etc In addition t...

Page 11: ...ting downward PARTS NEEDED Chalk Part 13 Straight Frame Tube Part 8 Curve Frame Tubes Part 9 Horizontal Tubes with Foam Part 10 Enclosure Netting Part 11 Self Locking Screw Part 21 STEP 16 Tie the elastic straps on the Enclosure Netting 14 to the Trampoline Top Rail frame by looping around the triangle rings on the trampoline mat and the Corner Top Rail with socket 3 as shown in FIGURE 17 Triangle...

Page 12: ...g Broken or fraying zipper in the enclosure opening Cease using trampoline immediately and secure it against unauthorized use if any of these conditions are present If any part of the trampoline frame requires cleaning simply wipe with a damp cloth Do not jump on the trampoline after cleaning until completely dry To clean chalk from mat wipe down net with wet rag Allow mat to fully dry before jump...

Reviews: