14
C AUTION
Wet, contaminated or damaged openings and connections
Leakage or damage to the pump set!
Only remove caps/covers from the openings of the pump set at the time of
installation.
1. Dismantle the pump (set).
Collect greases and other lubricants during dismantling.
2. Separate and sort the pump materials, e.g. by:
- Metals
- Plastics
- Electronic waste
- Greases and other lubricants
3. Dispose of materials in accordance with local regulations or in another controlled manner.
NOTE
If required, a blank Certificate of Decontamination can be downloaded on the internet
under:
www.pumpiran.com
3.4 Disposal
WAR NING
F luids posing a health hazard
Hazardous to persons and the environment!
Collect and properly dispose of flushing liquid and any fluid residues.
Wear safety clothing and a protective mask, if required.
Observe all legal regulations on the disposal of fluids posing a health hazard.
Store the pump (set) in a dry, protected room where the atmospheric humidity is as constant
as possible.
Rotate the shaft by hand once a month, e.g. via the motor fan.
If properly stored indoors, the pump set is protected for a maximum of 12 months. New
pumps/pump sets are supplied by our factory duly prepared for storage.
For storing a pump (set) which has already been operated, observe the instructions in
( Section 6.3.1 Page 39) .
3.3 Return to supplier
1. Drain the pump as described in the manual. ( Section 7.3 Page 47)
2. Always flush and clean the pump, particularly if it has been used for handling noxious,
explosive, hot or other hazardous fluids.
3. If the fluids handled by the pump leave residues which might lead to corrosion damage
when coming into contact with atmospheric humidity, or which might ignite when coming
into contact with oxygen, the pump set must also be neutralised, and anhydrous gas must
be blown through the pump for drying purposes.
4. The pump (set) must always be accompanied by a completed certificate of decontamination.
( Section 11 Page 64)
It is imperative to indicate any safety and decontamination measures taken.
3 Transport/Temporary Storage/Disposal