background image

www.pulsar.pl                                                               HPSB1512B                                                

GREEN POWER

 

 

 

7

 

RED LED: 

 

on – the PSU is supplied with 230V AC  

 

off – no 230V AC supply  

 

GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the terminal - marked with  

 symbol on the PSU enclosure. Operation of the PSU without the properly made and 

fully  operational  shock  protection  circuit  is  UNACCEPTABLE!  It  can  cause  a  device 
failure or an electric shock. 

 
4. Connect the receivers’ cables to the terminals 

V+ (+), V-(-) 

 of the PSU module.  

5. Connect the power (~230V) 
6. Connect the battery (mind the colours):   
- battery output (+V):  BAT+ cable / red, 
- battery output (0V):  BAT – cable / GND / black. 
7. Check the PSU operation indicator: green LED. 
8. Check the PSU output voltage: 
- the PSU voltage without load should amount to U=13.8V DC.   
9. After installing and checking proper working, the enclosure can be closed. 
 
3. Operating status indication. 

 
3.1 LED indication of operating status. 
The  is equipped with two diodes on the front panel: 
 

 
 
 
 

 
4. Operation and use. 

 
4.1 Overload or short circuit of the PSU output (SCP on). 
In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration 

of the voltage takes place immediately after the failure (overload) is over. 

 
4.2 Disconnection of discharged battery. 

The PSU is equipped with the discharged battery disconnection system. During the battery-assisted operation, 

reducing voltage below 9.5 V at the battery terminals will cause battery disconnection. 

 

4.3 Maintenance. 

Any and all maintenance operations may be performed following the disconnection of the PSU from the 

power supply network. The PSU   does not require performing any specific maintenance measures, however, in 
case of significant dust rate, its interior is recommended to be cleaned with compressed air. In case of fuse 
replacement, use a replacement of the same parameters. 
 

 

 
 
 
 
 
 
 
 

Summary of Contents for GREEN POWER HPSB 1512B

Page 1: ...HPSB 1512B v 1 0 HPSB 13 8V 1A 7Ah Buffer switch mode power supply unit EN Edition 6 from 11 08 2014 Supercedes the edition 5 from 05 06 2014...

Page 2: ...rload or short circuit of the PSU output SCP on 4 2 Disconnection of discharged battery 4 3 Maintenance 1 Technical description 1 1 General description A buffer PSU intended for uninterrupted supply t...

Page 3: ...ab 2 3 green LED indicates AC power 4 P1 potentiometer output voltage adjustment 5 BAT GND battery outputs BAT red GND black 6 TAMPER contact sabotage protection NC 7 Additional connector for LED indi...

Page 4: ...www pulsar pl HPSB1512B GREEN POWER 4 Fig 2 The view of the PSU...

Page 5: ...R output indicating enclosure opening microswitch NC contacts enclosure closed 0 5A 50V DC max LED indication AC diode indicating AC power status AUX diode indicating DC power status at the PSU output...

Page 6: ...convectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance During normal operation the total current drawn by the device may not exceed I 1A Maxim...

Page 7: ...amount to U 13 8V DC 9 After installing and checking proper working the enclosure can be closed 3 Operating status indication 3 1 LED indication of operating status The is equipped with two diodes on...

Page 8: ...later that within 14 days from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the...

Reviews: