www.pulsar.pl DIN1220
5
6. Check the output voltage PSU. If the value of the voltage requires adjustment, it should be set by the V
adj
potentiometer (12 ÷15V DC), monitoring the voltage at the output of the PSU.
7. Once the tests and operation control have been completed, the enclosure/cabinet can be locked.
Fig.3. Mounting on a DIN rail.
3. Operation and use.
3.1 Overload or short circuit of the PSU output (SCP on)
In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration
of the voltage takes place immediately after the failure (overload) is over.
3.2 Maintenance
Any and all maintenance operations may be performed following the disconnection of the PSU module from
the power supply network. The PSU module does not require performing any specific maintenance measures,
however, in case of significant dust rate, its interior is recommended to be cleaned with compressed air. In case of
fuse replacement, use a replacement of the same parameters.