Flooded suction mounting Fig. C (installing feeder at the base of tank on a platform) is the most trouble free type of 
installation. (Tank stands and platforms are available for all 
size feeders and tanks). The pump is secured on the 
platform, and then the clear suction tubing is attached to a 
bulkhead fitting assembly and the suction valve housing on 
the pump head. Since the suction tubing is always filled 
with solution, priming is accomplished much more quickly 
and the chance of losing prime on an installation where the 
feeder is used only a few hours a day, is greatly reduced. 
The feeder comes with a bleed valve assembly that 
attaches to the discharge valve in the pump head. The 
bleed valve allows you to manually prime the feeder and 
depressurize the discharge line without disconnecting the 
feeder from the tubing connections.  

 
NOTE:

 To operate without bleed valve, replace bleed 

valve (item #49) and 0.38 in. (0.96 cm) -tubing size discharge valve housing (item # 42) with a 0.50 in. (1.27 cm) -tubing 
size discharge valve housing (item #42) and coupling nut (item #43).  See page 12 (Wet End Assembly).  Items #42 and 
#43 are available from factory.  
 
Assemble tubing and fittings to the feeder (Fig. G). 

 

 Do not force fittings, HAND TIGHTEN ONLY.  Do not use additional sealants, such as pipe tape, on 

tubing fittings. Use additional sealants, such as pipe tape, on pipe fittings and tighten normally.

 

 

 If water is used to dissolve solid chemicals or create a dilute solution, the chemical tanks should be 

manually filled or an approved means must be used to prevent a cross connection between the chemical tank contents 
and the potable water line.  Check local plumbing regulations.  

 
CHEMICAL INJECTION: 

 

Chemical injection into an open tank: The discharge tubing can be 
placed in an open tank with or without the injection valve assembly. 
Each feeder is shipped with a spring loaded back check injection 
valve. This assists in a positive seal on the discharge side of the pump 
head preventing back flow.  
 
Pumps carrying the 'NSF' or the 'ETL Sanitation' (tested to NSF 
standard-50) approval are listed for swimming pools, spas, and hot 
tubs, and when proper materials are selected, are capable of handling 
but not limited to the following chemical solutions.  
 

12

1

/2% sodium hypochlorite 2% calcium hypochlorite 12% aluminum 

sulfate 10% hydrochloric acid 10% sodium hydroxide 5% sodium 
carbonate. 
 

 

INSTALLATION INTO A WELL PUMP SYSTEM: 

Make sure the voltage of the feeder matches the voltage of the 
well pump. 

Install the injection fitting into a tee which is installed into 

the water line going to the pressure tank. The end of the injection 
check valve should be in the main stream of the water line. A typical 
installation is shown in Figure H. 

For installation of pump for 

operating swimming pools, pump is to be supplied by an 
isolating transformer or thru an "RCD" (residual current device). 

 

 
NOTE: It is recommended to install the injection assembly in a vertical position on the bottom side of the water 
line (Figure J). 

 

 
This will insure proper sealing of the injection assembly check valve and prevent a back flow into the feeder's discharge 
line. Be sure arrow on injection fitting is pointing upward.  

Summary of Contents for Chem-Tech 100 Series

Page 1: ...READ ALL CAUTIONS CAREFULLY BEFORE INSTALLING PUMP INSTRUCTION MANUAL P N 32040 Rev C...

Page 2: ...conditioning specialists when treating potable water Always depressurize system prior to installation or disconnecting the metering pump tubing If injection point is lower than the chemical tank and...

Page 3: ...INSTALLING METERING PUMP 1 Chemicals used may be dangerous and should be used carefully and according to warnings on the label Follow the directions given with each type of chemical Do not assume chem...

Page 4: ...TING The carton should contain Metering Pump 4 ft 1 21 m Clear Flexible Suction Tubing 4 ft 1 21 m Stiff White Return Tubing Feeder can be mounted on a wall shelf bracket Figure B tank stand platform...

Page 5: ...manually filled or an approved means must be used to prevent a cross connection between the chemical tank contents and the potable water line Check local plumbing regulations CHEMICAL INJECTION Chemi...

Page 6: ...BAR install a pressure relief valve on the discharge side of the pump head Once the pressure reaches a certain level the pre set relief valve will return the solution being pumped back to the solution...

Page 7: ...ead POINT OF INJECTION Pipe corrosion can result if dillution at the injection point does not occur rapidly This problem is easily prevented by observing this simple rule install injection fitting so...

Page 8: ...site A test for chemical residual in the treated water is the best indication of the correct pump setting MAINTENANCE SCALE GASKETS AND CHECK VALVES When checking the metering pump or providing routi...

Page 9: ...wise Figure O 4 A new pump head or diaphragm should be installed if either is broken or cracked see parts list at the end of this manual The new pump head can be installed by going through the above s...