PTS 9042x Series Small Cell
AC Power Distribution Load Centers
Installation Guide
2
All Rights Reserved, 2017
www.pactechsol.com/TMOVendor
888-820-3508
Table of Contents
Figure 1: Dimensional Drawings. .............................................................................................. 5
1.2
Breaker Specifications
……..……….…………………………………………………………………..8
1.4
Application……………………………………………………………………………………………….13
2.1
Main Breakers ........................................................................................................................... 13
2.2
Distribution Breakers ................................................................................................................. 13
2.3
Optional Surge Protection Device……………………………………………………………............13
2.4
Optional External Disconnect Switch
...........................................................................
………...13
3.1 Steps to Inspect and
Remove…………………………………………………………………………14
Figure 3: Packaging .................................................................................................................. 14
3.2 Hardware Kits............................................................................................................................ 14
Table 1: PTS9042x Hardware Kit Components ......................................................................... 14
Figure 5: Mounting Example ..................................................................................................... 16
4.3 Mounting to flat surfaces ........................................................................................................... 17
4.4 Removing Dead Front Access Plate
………………………………………………………………….18
4.5 Wiring Ground
Connections……………………………………………………………………………19
4.6 Wiring Service and Load Connections
………………………………………………………………..
20
5.0 Breaker and Modules……………………………………………………………………………………..21
5.0 Main Breaker Replacement or Re-Configuration
……………………………………………………21
5.1 Load Breaker Replacement or Re-
Configuration……………………………………………………23
5.2 SPD Replacement or Re-
Configuration………………………………………………………………24
5.3 Re-Installing Dead Front Access Plate ...................................................................................... 26
6.0 Installation Review ........................................................................................................................ 27
7.0
Document and Revision Control
…………………………………………………………………..…….
28