Chapter 4: System Monitoring and Alarms
76
Set Payload Shutdown Timeout Command
To change the payload shutdown timeout, the
Set Payload Shutdown Timeout
command is
used:
[B8 xx 16 0A 40 00
<LSB byte of timeout>
<MSB byte of timeout>
]
Get Geographic Address Command
The IPMC allows reading the geographic address of the module using the
Get Geographic
Address
command, which has the following synopsis:
[B8 xx 2C 0A 40 00]
The IPMC responds to the
Get IPMB Address
command with the following reply:
[BC xx 2C 00 0A 40 00
<geographic address>
]
Firmware Upgrade Process
The IPMC firmware supports a reliable field upgrade procedure compatible with the
HPM.1
Specification
. The key features of the firmware upgrade procedures are as follows:
•
The upgrade can be performed over the serial debug/payload interface or over IPMB.
•
The upgrade procedure is performed while the IPMC firmware is online and operating normally.
•
Upgrades of the firmware component are reliable. A failure in the download (error or interruption)
does not disturb the IPMC's ability to continue using the “old” firmware or its ability to restart the
download process. Upgrades of the boot loader component are not reliable and may render the IPMC
non-functional in case of an incomplete upgrade.
•
Upgrades of the firmware component are reversible. The IPMC firmware automatically reverts back
to the previous firmware if there is a problem when first running the new code and can be reverted
manually using the HPM.1-defined
Manual Rollback
command. Upgrades of the boot loader
component are not reversible.
HPM.1 Boot Loader
•
The HPM.1 boot loader does not perform any upgrade actions
•
The HPM.1 boot loader is able to boot either of two redundant copies of the IPMC firmware in flash
•
The HPM.1 boot loader is able to automatically rollback a failed copy of the IPMC firmware and
activate the backup one.
•
The HPM.1 boot loader can be upgraded in-field as an HPM.1-upgradeable component.
Summary of Contents for CPC5565
Page 4: ...4...
Page 14: ...Figures 14 Figure 7 1 Battery Socket Locations 106 Figure 7 2 CPC5565 Board Dimensions 107...
Page 56: ...Chapter 3 Getting Started 56 Figure 3 16 PMC Card Installation Voltage Key Post...
Page 84: ...Chapter 4 System Monitoring and Alarms 84...
Page 100: ...Chapter 5 Connectors 100...
Page 102: ...Chapter 6 Reset 102...
Page 108: ...Chapter 7 Specifications 108...