-Proper Grounding and Shielding 

Proper grounding and shielding are essential for reliable system operation.  Low voltage DC and 
communication wiring must be protected from electrical noise introduced by 120v AC wiring, 
other voltages and signals which may be present in the building infrastructure. 

1.

 

 The main 120v power feeds from the breaker panel to the RB should have a separately 
pulled Green ground wire.  This should be bonded to the breaker panel source. 

 

Note: Supplied voltage must be constant.  If not, constant errors can occur. 

 

 Plug all open holes. 

1)

 

After installation of conduit and wire, all open holes must be plugged by electrician.  

 

Wiring Practices: 

 

All AC wiring should be routed away from DC, Communication, and Control wiring and 

should never intersect or cross.  Failure to do so can cause communication issues with an 
installed system.  

 

Ideally locate the Master and Secondary Nodes somewhere easily accessible such as in an 

electronics room or catwalk.  The reason for this is access to the Manual Control Override 
feature and for any service needs.   

Do not install the box on the ceiling.

  It is not designed to be installed in this manner 

and doing so will cause operation problems. 

 
 

Contact Performance Sports Systems at 800-848-8034 extension 236 for questions or 

additional information concerning the TSC 1500-WiFi

 

installation

Summary of Contents for TSC 1500XL

Page 1: ...L Installation Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION NO 8 5 1 7 5 1 2 3 0 R e v A A p...

Page 2: ...TSC 1500XL 1 Contents Section Page No Introduction 2 Cautions and Warnings 3 Installation 5...

Page 3: ...tor can easily reprogram each of the passwords to fit their individual security requirements Further the administrator can change the passwords as frequently as necessary TSC 1500XL was designed with...

Page 4: ...TSC 1500XL 3...

Page 5: ...sed on job No Substitutions Installation Procedure System consists of a Master Node panel and one or more Secondary Node panels dependent on the size of the job and one touchscreen supplied by Perform...

Page 6: ...ly for the length of run to meet the electrical service requirements 1 Connect the power wires to the Node panel as follows see Figure 1 Incoming hot to Black terminal block on the left side of the po...

Page 7: ...ely for the length of run minimum recommended size as follows 12 AWG for up to 90 feet of run 10 AWG for 90 feet to 140 feet of run 8 AWG for 140 feet to 240 feet of run 6 AWG for 240 feet to 380 feet...

Page 8: ...onnection on both ends The Master Node connection will connect on an open spot on the Ethernet Switch See figure 3 The Touch Screen connection will connect to the Ethernet port labeled Ethernet Figure...

Page 9: ...wires Route Serial Data cable away from any high voltage lines when connecting to secondary node panels 1 Connect the Serial Data cable to the Master PLC as shown in Figure 5 Use the chart for correct...

Page 10: ...ection at Secondary Node panels Figure 6 Figure 7 Note Follow installation below for connecting the RJ 45 connector to Serial Data cable this guide is also included with RJ 45 connector Ethernet cable...

Page 11: ...cording to these instructions Failure to do this can result in an inoperative system sluggish response or inability to reliably control the system components NOTE Do not run communications cable throu...

Page 12: ...nstallation of conduit and wire all open holes must be plugged by electrician Wiring Practices All AC wiring should be routed away from DC Communication and Control wiring and should never intersect o...

Page 13: ...Performance Sports Systems 9200 E 146th Street Noblesville IN 46060 800 848 8034 www perfsports com...

Reviews: