-16-
immediately.
7.
Use a good grounding system.
8.
Try to make the ground close to the connecting point of the grounding
club or origination point in the switchboard. Please refer to figure 16.
* Please install wiring according to input voltage
Contact an electrician or our service department if there is problem with
the installation
.
Summary of Contents for GP800 Power Series
Page 1: ...On line uninterruptible power supply User manual...
Page 2: ......
Page 6: ...2 environment 11 Do not leave objects on top of the UPS 12 Do not obstruct the air flow...
Page 14: ...10 Figure 8 Figure 10 Figure 9...
Page 30: ...26 Flow chart 1 of status handing...
Page 31: ...27 Flow chart 2 of status handing...
Page 32: ...28 Flow chart 3 of status handing Flow chart 3 of status handing...