
6740 Badminton System
5
OPERATION
1.
Now that the sleeves and covers are install and the grouting has cured, the system can be
setup for playing badminton.
a.
Open the floor covers and place each post into the sleeves with the rope clasp
positioned away from the court side.
b.
The net rope goes through the rope guide and down to the rope clasp to keep it
tensioned. Tension net to a 60” playing height at the center of the court and press
into the rope clasp. The top and bottom rope attachment goes through the net
grommets and ties to the post as shown.