PSS GARED 6740 Installation, Operation And Maintenance Instructions Download Page 5

 

  

6740 Badminton System

   

 

 

counter bore in one pass. Gradually work down to the depth until the floor plate is 
flush with surface floor.  Place the floor plate down into the counter bore several 
times so as to not make the hole too deep.  When installed, the plate must be 
perfectly flush with the top surface of the floor. 

11.

 

Place the ring in the routed out portion of the hole.  Inside the ring are (4) holes. Use 
wood screws provided in the holes to secure the ring to the floor.  Predrill pilot holes in 
wood to prevent wood screws from splitting the wood floor. Normally locate covers in 
such a fashion that they open away from the court, though this is not critical.   

12.

 

Wait a minimum of (7) days to allow the grout to completely cure before setting up the 
posts.   

 

 

Summary of Contents for GARED 6740

Page 1: ...Model 6740 Installation Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATIO...

Page 2: ...termine if substitute parts are acceptable It is recommended that an individual who has been properly trained perform assembly and set up of the badminton No one under the age of 18 should attempt ass...

Page 3: ...6740 Badminton System 2 SPECIFICATIONS...

Page 4: ...t from entering the bottom of sleeve 6 Insert the 2 5 8 O D sleeve and work it down into the grout until the inside bottom of the sleeve is 11 below the TOP surface of the floor Incorrect sleeve depth...

Page 5: ...flush with the top surface of the floor 11 Place the ring in the routed out portion of the hole Inside the ring are 4 holes Use wood screws provided in the holes to secure the ring to the floor Predri...

Page 6: ...rs and place each post into the sleeves with the rope clasp positioned away from the court side b The net rope goes through the rope guide and down to the rope clasp to keep it tensioned Tension net t...

Page 7: ...clasp and removed net Fold net up for storage c Remove net posts and move to storage d Be sure to close floor covers Covers must fit flush with floor for safe play Mantainance Annually check over the...

Page 8: ...ed Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 9200 E 146th Street Noblesville IN 46060 Noblesville IN 46060 800 848 8034 800 325 2682 www perfsports com www garedsports c...

Reviews: