Operating Instructions

 

PS-AMS Series PSQ

 

Version 2018/11/19 

 

 

 

 

 

 

           ©2018 PS Automation GmbH 

 

 

 

 

 

 

 

 

 

 

              

Subject to changes! 

 

Summary of Contents for PS-AMS PSQ Series

Page 1: ...Operating Instructions PS AMS Series PSQ Version 2018 11 19 2018 PS Automation GmbH Subject to changes...

Page 2: ...ace optional 13 8 4 Accessories 13 8 4 1 Space Heater optional 13 8 4 2 Adjusting Additional Position Switches optional 13 9 Status Display Operating Element Communication 14 9 1 Status LEDs 14 9 2 Co...

Page 3: ...these Operating Instructions must be followed for all work pertaining to the installation commissioning operation change of operating conditions and modes maintenance inspection repair and installatio...

Page 4: ...t is familiar with them and informed about potential hazards The specific regulations for the prevention of accidents have to be observed Damages caused by unauthorized modifications carried out on th...

Page 5: ...tuators in environments with high temperature fluctuations or high humidity we recommend using a heating resistor as well as a higher enclosure rating optional accessories Actuator type A B C D E F G...

Page 6: ...ee chapter 6 Manual Operation except when using the fail safe unit PSCP 6 Manual Operation A hand wheel is provided to operate the actuator in case of power failure or for valve adjustment PSQ AMS act...

Page 7: ...the valve shaft The drive bush 2 has an indicator tooth 3 or a marking hole 4 which clearly defines the position of the drive bush There also is a corresponding marking at the actuator recess or colo...

Page 8: ...vices must be conform to the standard IEC 364 4 41 protective class I resp DIN IEC 60364 4 44 according to the overvoltage category of the actuator Please protect all of the power supply and control c...

Page 9: ...ng diagram Wiring to the terminal box Figure 9 Open the terminal box Open the cover of the terminal box Insert the cable through the cable glands to the inside of the cover Figure 10 Plug modules Unsc...

Page 10: ...ring diagram for wiring to the main board Figure 12 Electrical terminals with local control PSC 2 with 1 phase AC DC The wiring diagram with Fieldbus and the above mentioned wiring diagrams are suppli...

Page 11: ...ver of the terminal box Figure 14 Close the cover After wiring is completed put on the cover properly tighten the 4 screws crosswise and tighten the cable glands After connecting all the required wire...

Page 12: ...rminals 12 and 13 main board resp 25 and 26 terminal box allows to drive the actuator to a parameterised safety position by applying a voltage of 24 V to 230 V 8 3 3 Output Terminals 8 3 3 1 Active Po...

Page 13: ...ver contacts for currents between 10 mA and 5 A at maximum 230 V Special switches with gold plated contacts for low power up to 100 mA and 30V are available on request Connection goes to terminal X6 o...

Page 14: ...the automatic commissioning run to adjust the actuator to the valve is located beside the LEDs See chapter 10 1 Cut off in end positions and 11 1 2 Commissioning Procedure Figure 21 Communication por...

Page 15: ...n the actuator will stop at the position which was found at a mechanical stop in the valve or the actuator during Automatic Commissioning If the closing point inside the valve dislocates the actuator...

Page 16: ...llen screw for CLOSED position Item 2 Allen screw for OPEN position Item 3 protective caps 11 1 2 Commissioning Procedure When adjusting a mechanical stop drive the actuator only by hand wheel not ele...

Page 17: ...ning procedure The automatic commissioning run start now The actuator will drive through the full adjusted range The green LED flashes quickly during this commissioning run After finishing it the actu...

Page 18: ...f the valve will be calculated in accordance with the programmed valve stroke After manual commissioning the actuator is ready for use The green LED is glowing permanently Note If the parameterised va...

Page 19: ...d Fail Safe PSCP Emergency power supply based on supercapacitors safety position OPEN CLOSED or free defined position Fieldbus Interface Digital transmission of nominal and actual value per mill or pe...

Page 20: ...rocess sensor x x Actuator position does not correspond to set value input A non linear valve curve has been parameterised Verify parameterised characteristic see instructions AMS PSCS Operating condi...

Page 21: ...end position has been passed over Valve seat worn or defective Check the valve seat x x Actuator supply voltage too low 1 Improper wiring of the mains supply 2 Jitter in supply voltage 3 Too low supp...

Page 22: ...22 16 CE Declaration of Conformity...

Page 23: ...23...

Page 24: ...o de Correos 142 E 43480 Vila Seca Tarragona Tel 34 9 77 39 11 09 Fax 34 9 77 39 44 80 E mail hans sertemo com www sertemo com Hong Kong MaxAuto Company Ltd Room 2008 20 F CCT Telecom Building 11 Wo S...