26
Installation
| 26 |
Version 1.0
INSTALLATION PROCESS:
•
Electric chain hoists must be grounded properly.
•
Lock-out and tag-out the main disconnect switch in ed-energized position before performing any service on hoist.
•
Customer must provide power supply cable, fuses, and main disconnect switch.
•
Check supply voltage is same as nameplate voltage on hoist.
•
Check voltage does not vary by more than ±10% from nominal value.
•
Do not use conductors smaller than those listed in this User Manual to supply power to hoist.
•
Never bypass limit switches, remove limit switch stops, or alter limit switch devices.
•
Check the electric installation and wire gauge selection at www.prowinch.com and Follow this simple steps)
LOCATE THE
QR CODE
SCAN IT
WAIT FOR
THE PAGE TO
LOAD
USE
INFORMATION
SCAN FOR
MORE INFO
LOADING...
Summary of Contents for PWHC1000i
Page 2: ...2 PWH 2 Version 1 0 This page intentionally left blank...
Page 55: ...51 Version 1 0 51 Technical Specs Part List Dimensions in mm...
Page 57: ...53 Version 1 0 53 Technical Specs Dimensions in mm Part List...
Page 59: ...55 Version 1 0 55 Technical Specs Part List Dimensions in mm...
Page 61: ...57 Version 1 0 57 Technical Specs Dimensions in mm Part List...
Page 63: ...WWW PROWINCH COM...