4
Operating instructions
Operating instructions
Controls and signals
Main switch
The main switch (Fig. 1, Position 7) is
used to switch the boiler on or off. The
main switch is situated on the right side of
the boiler control panel.
Caution:
The boiler must be put into
operation and switched on for the fi rst time
by an authorised service organisation!
Control panel
On the boiler’s control panel you can
monitor current values and set the required
parameters.
Fig. 1
1
2
4
3
5
6
7
The control panel has the following control
elements (Fig.1):
1
Timer switch – sets attenuation of tank
heating and attenuation of heating water.
2
MODE button – transition into setting
mode.
3
Display panel.
4
button.
5
Pressure gauge – displays pressure of
heating water.
6
RESET button – to unblock errors.
7
Main switch – switches boiler on and
off.