4
Assembly
A. Station assembly
● Attach the Heat Gun holder
Remove the heat gun holder screw
from the side of the station; attach the
heat gun holder to the station (Fig. 1)
B. Attach the nozzle
● Loosen the nozzle mounting screw,
attach the nozzle on heat gun then screw
it.
Show as the figure 2
C. Electrical Connection and Power ON
●Place the heat gun on the holder.(Fig3)
Fig3
●Loosen the pump securing screw which on the bottom of control station.
(See below pictures)
●Insert the power plug into socket
Fig. 1
Fig. 2
Summary of Contents for SS-989
Page 11: ...10 SS 989 2 1 SMD _ 480 C 896 F _ _ _ _ SS 989 _ _ _ _ _...
Page 12: ...11 _ _ _ _ SS 989 _ 1 SMD CPU 200 3 1...
Page 14: ...13 B 2 3 3 SMD QFP 1 2 4 2 4...
Page 15: ...14 PLCC 3 4 5 5 QFP 1 2 6 3 7 4 5 6 7...
Page 16: ...15 1 2 3 CAL 1 8 8 2 3 9 4 9 5 9...
Page 17: ...16 6 7 250 482...
Page 19: ...18 2015 Prokit s Industries Co LTD All rights reserved 2015001 C...