See operating voltage range in 5.1. Avoid supply of overvoltage.

 

Provide  a  reliable  electriccontact.  To  prevent  short-circuit,  insulate  places  of 
connection.

 

6.3 

CONNECTING PROCEDURE 

The lock operation is controlled by means of energizing and de-energizing. For this purpose, a 

controller  (control  board)  or  a  switch  (button)  is  generally  used.  The  controller  is  mounted  in 
accordance with its certificate. 

Connect the lock power wires adhering to the following polarity: 

Red 

– positive pole of the power supply; 

Blue 

– negative pole of the power supply; 

Application of voltage of reverse polarity does not provide the lock operability but does cause 

its failure.  

Example of the lock connection to the remote control system Promix-RDS. 

 

7.

 

SPECIAL ASPECTS OF INSTALLATION AND 
OPERATION

 

1)  The possibility of using of the locks for restriction of access to the premises and the place of 

installation  (outdoors  or  indoors)  are  determined  by  the 

installation  organization

  on  the 

basis  of  the  design  features  and  the  mounting  method,  room  criticality  level,  the  purpose  of 
the  access  restriction  regime  and  other  factors  (the  presence  of  security  providers,  video 
surveillance, etc.).  

2)  During  mounting  the  snap  and  the  latch,  it  is  necessary  to  ensure  their  coaxial  alignment 

within the latch free movement allowance. 

3)  Operation  of  an  installed  lock  should  be  tested  only  if  the  supply  voltage  can  be  applied 

thereto. 

4)  The properly mounted lock provides the necessary free motion (play) of the door of 1-2 mm. If 

the free play distance is shorter, the lock may remain closed when energized. 

8.

 

TROUBLE-SHOOTING

 

Troubles and problems 

Remedies 

The  lock  does  not  open  when  supply 
voltage is applied. 

Check  polarity  and  conformity  of  the  lock  supply 
voltage to the required value. 

Close  the  door tightly and  press  on  it  at  the  latch 
fastening  place,  and  apply  voltage  to  the  lock.  If 
the  lock  has  not  opened,  apply  elevated  DC 
voltage  of  20-30  V  for  a  short time (e.g.,  connect 
two 12-V batteries in series). 

 

--After  opening  of  the  snap,  shift  the  snap  closer 
to the door. 

Lock 

 

Controller Promix-CR.RX 

 

Remote control 

Promix-CR.TX 

 

~220 V 

 

Summary of Contents for Promix-SM112 Series

Page 1: ...her devices One lock makes it possible to close two swing doors at one fling and can be mounted on both right and left doors 2 LABELING The label stuck to the lock body contains the following information 1 Lock model 2 Patent number 3 Nominal supply voltage 4 Nominal consumed current 5 Date of manufacture and QCD mark 6 Identification number 7 Manufacturer s website For the list of lock modificati...

Page 2: ...ch with fixing bracket for fastening to 4 8 mm glass 1 pc 4 Thrust pad for glass 2 pcs 5 Bracket for latch fastening to chipboard 1 pc 6 Locking plate for chipboard 1 pc 7 Screw М3х6 cup head 2 pcs 8 Self tapping screw 3 5х15 cup head 2 pcs 9 Self tapping screw 3 5х15 countersunk 3 pcs 10 Self tapping screw 3 5х30 countersunk 2 pcs 11 Silicone damper 1 pc 12 Operating manual 1 pc 4 5 1 2 3 6 Pushe...

Page 3: ...n closed To open the door press on it then the lock with its built in pusher will push and open the door slightly If the door was not pressed upon then after de energizing the lock will become blocked and the door will remain locked 5 TECHNICAL DATA 5 1 TECHNICAL DATA Modification Promix SM112 10 Version normally closed DC supply voltage U V 12 2 Current consumed А 0 1 at 12V Supply pulse duration...

Page 4: ... insert the latch in the lock 1 and fix the lock on the base so that the latch is inserted up to the stop 3 To adjust the height of the lock 1 position use adjustment pads 2 put one or two pads under the lock see Figs in sections 3 and 4 4 Connect the lock see6 3 and test its operability by applying supply voltage Press on the door to make the latch enter the lock up to the stop The lock must unlo...

Page 5: ... organization on the basis of the design features and the mounting method room criticality level the purpose of the access restriction regime and other factors the presence of security providers video surveillance etc 2 During mounting the snap and the latch it is necessary to ensure their coaxial alignment within the latch free movement allowance 3 Operation of an installed lock should be tested ...

Page 6: ...f 30 to 50 С and a relative humidity not higher than 98 at 25º С in compliance with storage conditions as per GOST 15150 69 Locks transportation conditions must comply with group C as per GOST 23216 78 in terms of exposure to mechanical factors and Ж2 as per GOST 15150 69 in terms of exposure to climatic factors 11 SAFETY REQUIREMENTS The design of the locks ensures safety of personnel involved in...

Page 7: ...h the operation requirements Mechanical damages or disassembly of the products by the Buyer Non observance of the transportation and storage rules On expiration of the warranty service period the manufacturer provides after warranty service on a contractual basis 14 ACCEPTANCE AND PACKING CERTIFICATE Electromechanical lock Promix SM112 in quantity of ____ pieces 1 pc by default bearing the manufac...

Reviews: