
Maximum permissible operating pressure:
In the sample water line:
–
With chlorine sensor, 1 bar at 30 °C (sample
water)
1.
Tighten all threaded connectors prior to initial commissioning
2.
Open the shut-off valves downstream of the metering pumps,
in the sample water line and also the shut-off valves in your
system
3.
Insert the suction lances into the relevant chemical storage
tanks for acid or disinfectant (e.g. sodium-calcium hypo‐
chlorite)
4.
Plug the mains plug into the socket and switch on the mains
voltage
7.1 Adjust the flow sensor switching point
Sample water may escape.
1.
Adjust the flow to 50 l/h using the ball valve
2.
Hold the flow sensor in place and loosen the mounting clip a
little
3.
Press the float to 40 l/h using the flow sensor
ð
The error message should disappear.
4.
Hold the flow sensor in this position and tighten the mounting
clip
5.
Then re-adjust the flow required using the ball valve
6.
Acknowledge any error message that occurs
7.
Reset any possible consequences of this in the overall instal‐
lation
8.
Check the threaded connector for leak-tightness
The flow sensor should switch when
the flow falls (flow sensor is con‐
nected as an NC).
Start up
31
Summary of Contents for DULCODOS Pool Comfort
Page 4: ...12 EC Declaration of Conformity 77 13 Index 79 Table of contents 4...
Page 81: ...81...
Page 82: ...82...
Page 83: ...83...