
Fig. 3: Recommended pipes for the sensor
I.
Flow unit
II.
Sensor unit with operating unit
III.
Terminal box
1.
Backpressure valve. To regulate
the flow and in order to remove
small air bubbles
4.
Hose connector. 4.75 mm interior
diameter, 8 mm external diam‐
eter. Hose connection to the sam‐
pling site
5.
Detail: Hose
6.
Detail: Union nut hose connection
Mounting and Installation
22
Summary of Contents for DULCO turb C Series
Page 28: ...Fig 6 Overview of operating structure Operating diagram 28...
Page 72: ...12 Declaration of Conformity Fig 31 Declaration of Conformity Declaration of Conformity 72...
Page 74: ......
Page 75: ......
Page 76: ......