![Promac 378CLB Manual Download Page 7](http://html1.mh-extra.com/html/promac/378clb/378clb_manual_1615764007.webp)
4. Install table and clamp with bolt. Fig. 6
Fig.6
5. Attach the Head Assembly
* Carefulley put the head assembly over column and slide it
onto column into position. Align head frame with table
and base.
* Fix set screws in right side of head to lock head into
position then tighten with allen wrench. Fig. 7
Fig.7
6. Install the Feeding Handles.
* Screw knob on each feeding handle, install them
into hub of pinion shaft. Fig. 8
Fig.8
7. Attach the Arbor and Chuck
7-1 Insert abor into spindle first. Pull feeding handle
down to press abor inward. Fig.9
7-2 Open chuck jaws completely by turning attached
chuck key counter clockwise to the end. Put a
piece of scrap wood on the table to protect chuck
nose.
7-3 Install chuck to the arbor tightly. Fig.10
Fig.9
8. Install knob and screw of upper pulley cover. Fig.11
Fig.11
Fig .10
7