Montageanleitung /
Installation manual
MBN GmbH, Balthasar-Schaller-Str. 3, 86316 Friedberg - Germany
www.proled.com
Installation for vertical hanging:
1. Following items are needed for a vertical installation:
L6OP7A03 (1m) or L6OP7A03S (1m) or L6OPA04 (2,5m) or L6OPA04S (2,5m)
side input / concrete ceiling
vertical input / suspended ceiling
2. Installation steps
Mount together end cap, plug
Drilling machine with drill Ø6 mm
Cable length is 2m
1
30mm
30m
m
a
a
a 4 1
:
2
a 2 1
:
3